Assessing the Effect of Reliability-Based Maintenance Approach in Job Shop Scheduling with Setup Time and Energy Consideration Using Simulation; A Simulation Study. Issue 4 (2nd October 2021)
- Record Type:
- Journal Article
- Title:
- Assessing the Effect of Reliability-Based Maintenance Approach in Job Shop Scheduling with Setup Time and Energy Consideration Using Simulation; A Simulation Study. Issue 4 (2nd October 2021)
- Main Title:
- Assessing the Effect of Reliability-Based Maintenance Approach in Job Shop Scheduling with Setup Time and Energy Consideration Using Simulation; A Simulation Study
- Authors:
- Gupta, Shrajal
Jain, Ajai - Abstract:
- ABSTRACT: Maintenance in a stochastic job shop scheduling environment significantly impacts real-time scheduling problems with the environmental aspect. This simulation research assesses the effect of a reliability-based preventive maintenance approach to system performance for considering job shop scheduling problems with sequence-dependent setup time (SDST). Two types of reliability-based maintenance approaches are considered, i.e., reliability-centered preventive maintenance (RCPM) and a reliability-centered periodic preventive maintenance approach (RCPPM). The shop comprises 10 different machines and six job types. Six scheduling and two energy-oriented performance measures (Pms ) are considered for evaluating the system's performance. Results reveal that lower levels of reliability, namely, 0.74, 0.78, and 0.82 recommended for mean flow time, makespan, average operation energy consumption, average idle energy consumption, and total setups Pms . A 0.74 level of reliability is recommended for mean tardiness and the number of tardy jobs Pms for the RCPM approach. RCPPM approach provides the best system Pms by mean flow time, makespan, mean tardiness, average operation energy consumption, average idle energy consumption, and the number of tardy jobs when maintenance time is 5% of operation time. In contrast, mean setup, and total setups Pms are independent of maintenance time. Both approaches get compared, and its statistical analysis shows that if maintenance time is 15%ABSTRACT: Maintenance in a stochastic job shop scheduling environment significantly impacts real-time scheduling problems with the environmental aspect. This simulation research assesses the effect of a reliability-based preventive maintenance approach to system performance for considering job shop scheduling problems with sequence-dependent setup time (SDST). Two types of reliability-based maintenance approaches are considered, i.e., reliability-centered preventive maintenance (RCPM) and a reliability-centered periodic preventive maintenance approach (RCPPM). The shop comprises 10 different machines and six job types. Six scheduling and two energy-oriented performance measures (Pms ) are considered for evaluating the system's performance. Results reveal that lower levels of reliability, namely, 0.74, 0.78, and 0.82 recommended for mean flow time, makespan, average operation energy consumption, average idle energy consumption, and total setups Pms . A 0.74 level of reliability is recommended for mean tardiness and the number of tardy jobs Pms for the RCPM approach. RCPPM approach provides the best system Pms by mean flow time, makespan, mean tardiness, average operation energy consumption, average idle energy consumption, and the number of tardy jobs when maintenance time is 5% of operation time. In contrast, mean setup, and total setups Pms are independent of maintenance time. Both approaches get compared, and its statistical analysis shows that if maintenance time is 15% or more than 15% of the operation time, the RCPM method is recommended. If maintenance time is 10% or less than 10% of the operation time, maintenance planning is recommended using the RCPPM approach. Considering real-time scheduling work with the environmental aspect represents the novelty of the present study. Abstract : uf0001 … (more)
- Is Part Of:
- Smart science. Volume 9:Issue 4(2021)
- Journal:
- Smart science
- Issue:
- Volume 9:Issue 4(2021)
- Issue Display:
- Volume 9, Issue 4 (2021)
- Year:
- 2021
- Volume:
- 9
- Issue:
- 4
- Issue Sort Value:
- 2021-0009-0004-0000
- Page Start:
- 283
- Page End:
- 304
- Publication Date:
- 2021-10-02
- Subjects:
- Scheduling -- simulation -- job shop -- reliability-centered preventive maintenance -- reliability-centered periodic preventive maintenance -- sequence-dependent setup time
- Journal URLs:
- http://www.tandfonline.com/ ↗
- DOI:
- 10.1080/23080477.2021.1938502 ↗
- Languages:
- English
- ISSNs:
- 2308-0477
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 19952.xml