Deformation Failure and Support Test of Surrounding Rock in Deep Arched Roadway with Straight Wall. (31st August 2021)
- Record Type:
- Journal Article
- Title:
- Deformation Failure and Support Test of Surrounding Rock in Deep Arched Roadway with Straight Wall. (31st August 2021)
- Main Title:
- Deformation Failure and Support Test of Surrounding Rock in Deep Arched Roadway with Straight Wall
- Authors:
- Pan, Shuqi
Liu, Shuaitao
Cao, Liming
Guo, Jianqiang
Yuan, Chao - Other Names:
- Liu Jie Academic Editor.
- Abstract:
- Abstract : The deformation and failure of the uphill roadway on the 3rd horizontal track in the No. 6 Mine of Pingdingshan Coal Group was taken as the engineering background. The similar simulation material of the roadway surrounding rock with quartz sand as the aggregate, cement as the cementing agent, and gypsum powder as the regulator was selected. Through mechanical tests on 25 sets of specimens with different proportions, the best proportion of similar simulated materials for simulating the deformation and failure of the surrounding rock of the roadway was obtained. Later, a large-scale deep mine roadway simulation test system independently developed by the company was used to carry out the roadway deformation and failure test. First, load the test body to the set initial stress state, and then carry out the full-face excavation and unloading of the roadway; finally, load it in the vertical direction until the roadway wall is damaged. It can realize the actual effect of simulation of roadway deformation and failure under the path of "high stress + internal unloading + stress adjustment." The results showed that after the deep roadway is excavated with preload and high stress, the surrounding rock deformation, failure, and instability of the roadway mainly experience 3 periods: the first period is the period of uniform deformation of the roadway surrounding rock, the second period is the development period of the roadway surrounding rock slab structure, and the thirdAbstract : The deformation and failure of the uphill roadway on the 3rd horizontal track in the No. 6 Mine of Pingdingshan Coal Group was taken as the engineering background. The similar simulation material of the roadway surrounding rock with quartz sand as the aggregate, cement as the cementing agent, and gypsum powder as the regulator was selected. Through mechanical tests on 25 sets of specimens with different proportions, the best proportion of similar simulated materials for simulating the deformation and failure of the surrounding rock of the roadway was obtained. Later, a large-scale deep mine roadway simulation test system independently developed by the company was used to carry out the roadway deformation and failure test. First, load the test body to the set initial stress state, and then carry out the full-face excavation and unloading of the roadway; finally, load it in the vertical direction until the roadway wall is damaged. It can realize the actual effect of simulation of roadway deformation and failure under the path of "high stress + internal unloading + stress adjustment." The results showed that after the deep roadway is excavated with preload and high stress, the surrounding rock deformation, failure, and instability of the roadway mainly experience 3 periods: the first period is the period of uniform deformation of the roadway surrounding rock, the second period is the development period of the roadway surrounding rock slab structure, and the third period is the period of instability of the roadway surrounding rock slab structure. Combined with the time period of deformation and failure of the surrounding rock of the roadway, the damage scope of the surrounding rock and the actual situation of the site engineering. A step-by-step combined roadway repair and support plan of "bolt mesh + shotcrete + full-face hollow grouting anchor cable" with hollow grouting anchor cable as the core was determined. The stability of the repaired roadway has been significantly improved, ensuring the long-term use of the roadway. … (more)
- Is Part Of:
- Advances in civil engineering. Volume 2021(2021)
- Journal:
- Advances in civil engineering
- Issue:
- Volume 2021(2021)
- Issue Display:
- Volume 2021, Issue 2021 (2021)
- Year:
- 2021
- Volume:
- 2021
- Issue:
- 2021
- Issue Sort Value:
- 2021-2021-2021-0000
- Page Start:
- Page End:
- Publication Date:
- 2021-08-31
- Subjects:
- Civil engineering -- Periodicals
Civil engineering
Periodicals
624 - Journal URLs:
- http://bibpurl.oclc.org/web/50276 ↗
http://rzblx1.uni-regensburg.de/ezeit/warpto.phtml?colors=7&jour_id=109850 ↗
https://www.hindawi.com/journals/ace/ ↗ - DOI:
- 10.1155/2021/3208974 ↗
- Languages:
- English
- ISSNs:
- 1687-8086
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 18726.xml