Towards an efficient risk assessment in software projects–Fuzzy reinforcement paradigm. (October 2018)
- Record Type:
- Journal Article
- Title:
- Towards an efficient risk assessment in software projects–Fuzzy reinforcement paradigm. (October 2018)
- Main Title:
- Towards an efficient risk assessment in software projects–Fuzzy reinforcement paradigm
- Authors:
- Sangaiah, Arun Kumar
Samuel, Oluwarotimi Williams
Li, Xiong
Abdel-Basset, Mohamed
Wang, Haoxiang - Abstract:
- Abstract: Effective prioritization of software project risks play an important role in determining whether the project will be successful in terms of performance characteristics or not. In this context, this study aims at hybridizing fuzzy multi criteria decision making approaches for the development of an assessment framework that can be used to efficiently identify and rank notable software project risks will aid decision making during the lifecycle of a software product. Specifically, for the assessment of project risk, we have integrated fuzzy Decision Making Trial and Evaluation Laboratory, Fuzzy Multi-Criteria Decision Making and TODIM (an acronym in Portuguese for Interactive and Multiple Attribute Decision Making) approaches. The proposed methodology is used for providing an effective rating mechanism to measure software risk factors. The effectiveness of the proposed approach results have been compared with earlier methods for the assessment of software project risks. The comparison was done based on the OMRON data set of 40 software projects. Evaluation results reveal that the integration of fuzzy approaches could be effective and as well accurate compared to existing approaches for evaluating software project risks.
- Is Part Of:
- Computers & electrical engineering. Volume 71(2018)
- Journal:
- Computers & electrical engineering
- Issue:
- Volume 71(2018)
- Issue Display:
- Volume 71, Issue 2018 (2018)
- Year:
- 2018
- Volume:
- 71
- Issue:
- 2018
- Issue Sort Value:
- 2018-0071-2018-0000
- Page Start:
- 833
- Page End:
- 846
- Publication Date:
- 2018-10
- Subjects:
- Project risk -- Project performance -- Fuzzy DEMATEL -- FMCDM -- TODIM
Computer engineering -- Periodicals
Electrical engineering -- Periodicals
Electrical engineering -- Data processing -- Periodicals
Ordinateurs -- Conception et construction -- Périodiques
Électrotechnique -- Périodiques
Électrotechnique -- Informatique -- Périodiques
Computer engineering
Electrical engineering
Electrical engineering -- Data processing
Periodicals
Electronic journals
621.302854 - Journal URLs:
- http://www.sciencedirect.com/science/journal/00457906/ ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.compeleceng.2017.07.022 ↗
- Languages:
- English
- ISSNs:
- 0045-7906
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.680000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 18558.xml