Cite
HARVARD Citation
Dowell, A. (2021). Two full capacity generators—Why is the calculated emergency power system probability of failure on demand so high?. Process safety progress. 40 (3), pp. 79-83. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Dowell, A. (2021). Two full capacity generators—Why is the calculated emergency power system probability of failure on demand so high?. Process safety progress. 40 (3), pp. 79-83. [Online].