Technical and logistical challenges of the construction of the Museumsinsel Station in Berlin. Issue 5 (1st October 2019)
- Record Type:
- Journal Article
- Title:
- Technical and logistical challenges of the construction of the Museumsinsel Station in Berlin. Issue 5 (1st October 2019)
- Main Title:
- Technical and logistical challenges of the construction of the Museumsinsel Station in Berlin
- Authors:
- Schmeiser, Josef
Hoppe, Peter
Theiss, Reinhold - Abstract:
- Abstract: The closing of the gap in line U5 of the Berlin underground completes the missing connection between the Alexanderplatz and Brandenburger Tor stations. The existing line U5 currently ends at the Alexanderplatz. With the closure of the gap, the existing tunnels at the Berliner Roten Rathaus will be connected to the Brandenburger Tor station on the line U55. The project includes the construction of three new underground stations and two single‐track tunnels connecting them, which are being tunnelling by shield machines. The new alignment thus passes deep under the city, under the River Spree, the new Berliner Schloss and the Spreekanal as well as running along beneath the street Unter den Linden to the Brandenburger Tor. The construction activities are taking place right in the centre of Berlin and the particular local conditions are a logistical and technical challenge. Abstract: Der Lückenschluss der U‐Bahnlinie U5 stellt die fehlende Verbindung zwischen den Haltestellen Alexanderplatz und Brandenburger Tor her. Die bestehende Linie U5 endet derzeit am Alexanderplatz. Mit dem Lückenschluss werden die bestehenden Tunnelanlagen am Berliner Roten Rathaus mit der U‐Bahnstation Brandenburger Tor der Linie U55 verbunden. Das Projekt umfasst den Neubau von drei U‐Bahnstationen und zwei sie verbindende eingleisige Tunnel, die im Schildvortrieb hergestellt werden. Dabei unterfährt die neue Trasse innerstädtisch in Tieflage die Spree, das Neue Berliner Schloss und denAbstract: The closing of the gap in line U5 of the Berlin underground completes the missing connection between the Alexanderplatz and Brandenburger Tor stations. The existing line U5 currently ends at the Alexanderplatz. With the closure of the gap, the existing tunnels at the Berliner Roten Rathaus will be connected to the Brandenburger Tor station on the line U55. The project includes the construction of three new underground stations and two single‐track tunnels connecting them, which are being tunnelling by shield machines. The new alignment thus passes deep under the city, under the River Spree, the new Berliner Schloss and the Spreekanal as well as running along beneath the street Unter den Linden to the Brandenburger Tor. The construction activities are taking place right in the centre of Berlin and the particular local conditions are a logistical and technical challenge. Abstract: Der Lückenschluss der U‐Bahnlinie U5 stellt die fehlende Verbindung zwischen den Haltestellen Alexanderplatz und Brandenburger Tor her. Die bestehende Linie U5 endet derzeit am Alexanderplatz. Mit dem Lückenschluss werden die bestehenden Tunnelanlagen am Berliner Roten Rathaus mit der U‐Bahnstation Brandenburger Tor der Linie U55 verbunden. Das Projekt umfasst den Neubau von drei U‐Bahnstationen und zwei sie verbindende eingleisige Tunnel, die im Schildvortrieb hergestellt werden. Dabei unterfährt die neue Trasse innerstädtisch in Tieflage die Spree, das Neue Berliner Schloss und den Spreekanal sowie in Längsrichtung die Straße Unter den Linden bis zum Brandenburger Tor. Die Bautätigkeiten finden im Herzen Berlins statt und stellen aufgrund der zentralen Lage und der besonderen Randbedingungen eine logistische und technische Herausforderung dar. … (more)
- Is Part Of:
- Geomechanik und Tunnelbau. Volume 12:Issue 5(2019:Oct.)
- Journal:
- Geomechanik und Tunnelbau
- Issue:
- Volume 12:Issue 5(2019:Oct.)
- Issue Display:
- Volume 12, Issue 5 (2019)
- Year:
- 2019
- Volume:
- 12
- Issue:
- 5
- Issue Sort Value:
- 2019-0012-0005-0000
- Page Start:
- 426
- Page End:
- 433
- Publication Date:
- 2019-10-01
- Subjects:
- urban tunnel construction -- freezing
innerstädtischer Tunnelbau -- Vereisung
Subway construction -- Construction works
U‐Bahnbau -- Ausführung
Engineering geology -- Periodicals
Soil mechanics -- Periodicals
Rock mechanics -- Periodicals
Tunneling -- Periodicals
624.151 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)1865-7389 ↗
http://www3.interscience.wiley.com/journal/117885018/home ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/geot.201900033 ↗
- Languages:
- English
- ISSNs:
- 1865-7362
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 17141.xml