Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. (22nd December 2013)
- Record Type:
- Journal Article
- Title:
- Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. (22nd December 2013)
- Main Title:
- Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
- Authors:
- Yuan, Huawei
Jing, Yuanwei
Huang, Jinping
Ren, Tao - Other Names:
- Sotskov Yuri Academic Editor.
- Abstract:
- Abstract : This paper considers the m -machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production. First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem. To further evaluate the performance of the algorithm, a new lower bound with performance guarantee is designed. At the end of the paper, numerical simulations show the effectiveness of the proposed algorithm and lower bound.
- Is Part Of:
- Journal of applied mathematics. Volume 2013(2013)
- Journal:
- Journal of applied mathematics
- Issue:
- Volume 2013(2013)
- Issue Display:
- Volume 2013, Issue 2013 (2013)
- Year:
- 2013
- Volume:
- 2013
- Issue:
- 2013
- Issue Sort Value:
- 2013-2013-2013-0000
- Page Start:
- Page End:
- Publication Date:
- 2013-12-22
- Subjects:
- Mathematics -- Periodicals
519.05 - Journal URLs:
- https://www.hindawi.com/journals/jam/ ↗
- DOI:
- 10.1155/2013/498282 ↗
- Languages:
- English
- ISSNs:
- 1110-757X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 17010.xml