Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction. (20th August 2018)
- Record Type:
- Journal Article
- Title:
- Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction. (20th August 2018)
- Main Title:
- Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction
- Authors:
- Kong, Liulin
Li, Heng
Luo, Hanbin
Ding, Lieyun
Zhang, Xiaoling - Abstract:
- Abstract: Despite a great deal of research into precast production scheduling published in academic journals worldwide, little attention has been given to environmental performance related to precast construction transportation and assembly scheduling problems. To address this issue, this paper studies the Just-in-Time (JIT) strategy for supply chain management of precast construction while considering time-dependent transportation time and on-site assembly time. There are two main contributions of our work. First, our analysis expands the current batch-scheduling model of minimizing earliness/tardiness penalties, by incorporating environmental impact considering the time-dependent transportation time and economic impact of resources wasted by waiting for on-site assembly. Second, we quantify the economic and environmental performance using our research objective, consisting of earliness/tardiness penalties, an additional transportation time penalty, and a resource waste penalty. The optimal results show that, compared with the supplier's intuitive minimax optimization with deliveries on the earliest due date, there is an average 10.7% reduction of the objective value of a one-day assembly task by our proposed method. The results also show that the objective of achieving additional environmental performance conflicts with that of obtaining economic performance. However, sensitivity analysis further shows it is not always true to consider only additional environmentalAbstract: Despite a great deal of research into precast production scheduling published in academic journals worldwide, little attention has been given to environmental performance related to precast construction transportation and assembly scheduling problems. To address this issue, this paper studies the Just-in-Time (JIT) strategy for supply chain management of precast construction while considering time-dependent transportation time and on-site assembly time. There are two main contributions of our work. First, our analysis expands the current batch-scheduling model of minimizing earliness/tardiness penalties, by incorporating environmental impact considering the time-dependent transportation time and economic impact of resources wasted by waiting for on-site assembly. Second, we quantify the economic and environmental performance using our research objective, consisting of earliness/tardiness penalties, an additional transportation time penalty, and a resource waste penalty. The optimal results show that, compared with the supplier's intuitive minimax optimization with deliveries on the earliest due date, there is an average 10.7% reduction of the objective value of a one-day assembly task by our proposed method. The results also show that the objective of achieving additional environmental performance conflicts with that of obtaining economic performance. However, sensitivity analysis further shows it is not always true to consider only additional environmental performance for the suppliers to achieve 'green' value. For a sustainable business, the customer's service-JIT delivery should also be considered. Thus, when the policy makers assign importance weights to different objectives, they should fully consider both the economic and environmental impacts. The research contributes to batch delivery theory by expanding the approach to a time-dependent delivery model by considering both the economic and environmental effects. The method developed is of practical value for precast building projects to help in the successful implementation of sustainable development. Highlights: JIT is applied to the time-dependent delivery and precast components assembly considering industrial sustainability. We model the problem of defining optimal batch deliveries considering economic and environmental effects. A polynomial time optimization algorithm is developed to solve the proposed problem. The proposed method contributes to batch delivery theory in precast construction. … (more)
- Is Part Of:
- Journal of cleaner production. Volume 193(2018)
- Journal:
- Journal of cleaner production
- Issue:
- Volume 193(2018)
- Issue Display:
- Volume 193, Issue 2018 (2018)
- Year:
- 2018
- Volume:
- 193
- Issue:
- 2018
- Issue Sort Value:
- 2018-0193-2018-0000
- Page Start:
- 684
- Page End:
- 701
- Publication Date:
- 2018-08-20
- Subjects:
- Precast construction -- Just-in-time strategy -- Time-dependent transportation time -- Resource reduction -- Batch scheduling
Factory and trade waste -- Management -- Periodicals
Manufactures -- Environmental aspects -- Periodicals
Déchets industriels -- Gestion -- Périodiques
Usines -- Aspect de l'environnement -- Périodiques
628.5 - Journal URLs:
- http://www.sciencedirect.com/science/journal/09596526 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.jclepro.2018.05.037 ↗
- Languages:
- English
- ISSNs:
- 0959-6526
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4958.369720
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 16645.xml