Critical review of building handover-related research in construction and facility management journals. Issue 1 (9th December 2019)
- Record Type:
- Journal Article
- Title:
- Critical review of building handover-related research in construction and facility management journals. Issue 1 (9th December 2019)
- Main Title:
- Critical review of building handover-related research in construction and facility management journals
- Authors:
- Zhu, Lei
Shan, Ming
Xu, Zhao - Abstract:
- Abstract : Purpose: Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage, hindering the achievement of sustainable development of buildings. Therefore, the purpose of this paper is to review the building handover-related issues and research in construction and facility management (FM) journals. The specific objectives of this study include: analyze the research trends and overview the handover-related publications; identify the major research topics on the handover of buildings; identify research gaps and propose future research directions. Design/methodology/approach: This study opted for a four-step systematic review of papers from the well-known academic journals in the construction and FM respects. Findings: The results first revealed the increasing research interest in the handover of buildings from the researchers. Moreover, the post-construction defects, poor information fidelity, poor interoperability between building information modeling (BIM) and FM technologies, and insufficient consideration of end users were identified as the most concerned challenges for a building handover. Furthermore, identifying and formalizing information requirements for handover, improving the handover process, and improving the interoperability between BIM and FM were solutions mostly emphasized by researchers. Research limitations/implications: As the first systematicAbstract : Purpose: Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage, hindering the achievement of sustainable development of buildings. Therefore, the purpose of this paper is to review the building handover-related issues and research in construction and facility management (FM) journals. The specific objectives of this study include: analyze the research trends and overview the handover-related publications; identify the major research topics on the handover of buildings; identify research gaps and propose future research directions. Design/methodology/approach: This study opted for a four-step systematic review of papers from the well-known academic journals in the construction and FM respects. Findings: The results first revealed the increasing research interest in the handover of buildings from the researchers. Moreover, the post-construction defects, poor information fidelity, poor interoperability between building information modeling (BIM) and FM technologies, and insufficient consideration of end users were identified as the most concerned challenges for a building handover. Furthermore, identifying and formalizing information requirements for handover, improving the handover process, and improving the interoperability between BIM and FM were solutions mostly emphasized by researchers. Research limitations/implications: As the first systematic review of building handover-related issues and research, this study is the building block for future research on this topic. The findings provide guidance for researchers in the construction and FM research community, and help them form useful collaboration for future research opportunities and find future research directions. Practical implications: The identified significant challenges and potential solutions for a building handover could assist practitioners in making rational decisions on developing or adopting relevant technologies, and reshaping their management patterns and working processes. Moreover, the findings could be severed as evidence for policymakers to initiate policies, such as documents e-submission and timely updating BIMs, to achieve the vision of model-based project delivery. Originality/value: This study contributed to the body of knowledge of sustainable development by providing a new insight to tackle the hindrance to the smooth transition from the construction to the operation. … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 28:Issue 1(2021)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 28:Issue 1(2021)
- Issue Display:
- Volume 28, Issue 1 (2021)
- Year:
- 2021
- Volume:
- 28
- Issue:
- 1
- Issue Sort Value:
- 2021-0028-0001-0000
- Page Start:
- 154
- Page End:
- 173
- Publication Date:
- 2019-12-09
- Subjects:
- Project management -- Strategic management -- Building information modelling
Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-10-2018-0442 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 16630.xml