Cite

HARVARD Citation

    Ladj, A. et al. (2021). Hybrid of metaheuristic approaches and fuzzy logic for the integrated flowshop scheduling with predictive maintenance problem under uncertainties. European journal of industrial engineering. pp. 675-710. [Online]. 
  
Back to record