Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China. Issue 1 (10th September 2020)
- Record Type:
- Journal Article
- Title:
- Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China. Issue 1 (10th September 2020)
- Main Title:
- Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China
- Authors:
- Zhou, Man
Chen, Yaying
Su, Xiaolong
An, Ling - Abstract:
- Abstract : A specialised emergency field hospital was constructed in record time in Wuhan, China shortly after the initial outbreak of the Covid-19 pandemic. Covering an area of 34 000 m 2 and providing 1000 beds, Huoshenshan Hospital was more advanced and had more rigorous isolation systems than most current infectious-disease hospitals, but it was delivered in just 10 days. The rapid construction benefited from a unique modular design, over 4000 people who worked around the clock and a series of advanced technologies such as building information modelling, modular construction and 5G communications. The hospital played a crucial role in controlling the pandemic in China.
- Is Part Of:
- Proceedings of ICE. Volume 174:Issue 1(2021)
- Journal:
- Proceedings of ICE
- Issue:
- Volume 174:Issue 1(2021)
- Issue Display:
- Volume 174, Issue 1 (2021)
- Year:
- 2021
- Volume:
- 174
- Issue:
- 1
- Issue Sort Value:
- 2021-0174-0001-0000
- Page Start:
- 29
- Page End:
- 34
- Publication Date:
- 2020-09-10
- Subjects:
- buildings, structures & design -- project management -- structural frameworks
Civil engineering -- Periodicals
624 - Journal URLs:
- https://www.icevirtuallibrary.com/journal/jcien ↗
- DOI:
- 10.1680/jcien.20.00024 ↗
- Languages:
- English
- ISSNs:
- 0965-089X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 15944.xml