Cite
HARVARD Citation
Choi, J. et al. (2015). Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage. Journal of computational design and engineering. 2 (1), pp. 16-25. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Choi, J. et al. (2015). Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage. Journal of computational design and engineering. 2 (1), pp. 16-25. [Online].