Rail expansion devices and maximum dilation length in railway bridges. An experimental study. (15th February 2021)
- Record Type:
- Journal Article
- Title:
- Rail expansion devices and maximum dilation length in railway bridges. An experimental study. (15th February 2021)
- Main Title:
- Rail expansion devices and maximum dilation length in railway bridges. An experimental study
- Authors:
- Garcia-Sanchez, David
Sañudo, Roberto
Miranda, Marina
Tárrago, Nerea
Lenart, Stanislav - Abstract:
- Highlights: Review of the most important Rail Expansion Devices used in railways bridges in Spain. Theoretical and field analysis of some of these Rail Expansion Devices (REDs). Analysis of the existing REDs of forty-four bridges and viaducts on the Spanish High-Speed Railway. Recommendations for design, construction and maintenance of REDs. Abstract: The use of rail expansion devices (RED) interrupts the continuity of the welded rail, causing an irregularity with the consequent reduction in comfort, but with the benefit of a significant stress reduction in the rails. Currently the Spanish Railway Administrator uses three types of RED according to their range: 300 (small RED), 600 (medium RED) and 1200 mm (large RED) for all railway structures in the network. Their use has led to the construction of railway bridges and viaducts of maximum free expansion length of just over 1100 m. Development of new high-speed railway lines increasingly demands longer structures. Thus, the maximum allowed free expansion length should be increased. This problem can be faced from two fronts: (1) the improvement of the performance of REDs by developing new designs and (2) the enhanced prediction of the bridges and viaducts real movements caused by retraction, creep and temperature. It is precisely this last approach that has been developed by analysing and reviewing some existing structures. Forty-four bridges and viaducts on the Spanish High-Speed Railway network. Specifically, the railwayHighlights: Review of the most important Rail Expansion Devices used in railways bridges in Spain. Theoretical and field analysis of some of these Rail Expansion Devices (REDs). Analysis of the existing REDs of forty-four bridges and viaducts on the Spanish High-Speed Railway. Recommendations for design, construction and maintenance of REDs. Abstract: The use of rail expansion devices (RED) interrupts the continuity of the welded rail, causing an irregularity with the consequent reduction in comfort, but with the benefit of a significant stress reduction in the rails. Currently the Spanish Railway Administrator uses three types of RED according to their range: 300 (small RED), 600 (medium RED) and 1200 mm (large RED) for all railway structures in the network. Their use has led to the construction of railway bridges and viaducts of maximum free expansion length of just over 1100 m. Development of new high-speed railway lines increasingly demands longer structures. Thus, the maximum allowed free expansion length should be increased. This problem can be faced from two fronts: (1) the improvement of the performance of REDs by developing new designs and (2) the enhanced prediction of the bridges and viaducts real movements caused by retraction, creep and temperature. It is precisely this last approach that has been developed by analysing and reviewing some existing structures. Forty-four bridges and viaducts on the Spanish High-Speed Railway network. Specifically, the railway Lines Madrid-Barcelona, Cordoba-Malaga and Madrid-Valladolid, have been analysed to know the degree of strain of the existing REDs. With these measurements, the possibility of increasing the length of maximum free expansion of the deck has been examined and it has been proven to be possible as predicted strains were higher than the measured ones. Recommendations given have served to developed longer railway structures in Spain. … (more)
- Is Part Of:
- Engineering structures. Volume 229(2021)
- Journal:
- Engineering structures
- Issue:
- Volume 229(2021)
- Issue Display:
- Volume 229, Issue 2021 (2021)
- Year:
- 2021
- Volume:
- 229
- Issue:
- 2021
- Issue Sort Value:
- 2021-0229-2021-0000
- Page Start:
- Page End:
- Publication Date:
- 2021-02-15
- Subjects:
- Rail Expansion device (RED) -- High speed line -- Free expansion -- Restricted expansion -- Rail thermic stress -- Bridge -- Viaduct
Structural engineering -- Periodicals
Structural analysis (Engineering) -- Periodicals
Construction, Technique de la -- Périodiques
Génie parasismique -- Périodiques
Pression du vent -- Périodiques
Earthquake engineering
Structural engineering
Wind-pressure
Periodicals
624.105 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01410296 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.engstruct.2020.111605 ↗
- Languages:
- English
- ISSNs:
- 0141-0296
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3770.032000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 15411.xml