Achieving efficient nitrogen removal from real sewage via nitrite pathway in a continuous nitrogen removal process by combining free nitrous acid sludge treatment and DO control. (15th September 2019)
- Record Type:
- Journal Article
- Title:
- Achieving efficient nitrogen removal from real sewage via nitrite pathway in a continuous nitrogen removal process by combining free nitrous acid sludge treatment and DO control. (15th September 2019)
- Main Title:
- Achieving efficient nitrogen removal from real sewage via nitrite pathway in a continuous nitrogen removal process by combining free nitrous acid sludge treatment and DO control
- Authors:
- Jiang, Cancan
Xu, Shengjun
Wang, Rui
Feng, Shugeng
Zhou, Sining
Wu, Shimin
Zeng, Xiangui
Wu, Shanghua
Bai, Zhihui
Zhuang, Guoqiang
Zhuang, Xuliang - Abstract:
- Abstracts: The incomplete denitrification due to insufficient carbon resource in the wastewater treatment plants (WWTPs) resulted in low nitrogen removal efficiency, which has become a widespread problem in China and all around the world. Reducing the requirement of carbon source by manipulating the nitrogen removal pathway from conventional nitrification-denitrification to partial nitrification-denitrification is considered as an efficient solution. In this article, the feasibility of combining free nitrous acid (FNA) sludge treatment and DO control to achieve partial nitrification-denitrification in a continuous flow system (aerobic-anoxic-oxic process) using real sewage was assessed. The nitrite pathway was rapidly established in the experimental reactor within 23 days by simultaneously lowering DO concentration in aerobic zone to 0.5 mg/L and treating 30% of the activated sludge per day from the reactor in the FNA sludge treatment unit with FNA concentration of 1.2 mg N/L and exposure time of 18 h. The nitrite oxidizing bacteria (NOB) were efficiently washed out and the partial nitrification process could maintain stable in the experimental reactor even after cease of FNA treatment and increase of DO concentrations in the main stream to 1.5 mg/L, with an average nitrite accumulation rate of above 78%. In contrast, the nitrite accumulation rate was just around 58% during low DO concentrations phase and declined quickly to below 1% after the DO concentrations wereAbstracts: The incomplete denitrification due to insufficient carbon resource in the wastewater treatment plants (WWTPs) resulted in low nitrogen removal efficiency, which has become a widespread problem in China and all around the world. Reducing the requirement of carbon source by manipulating the nitrogen removal pathway from conventional nitrification-denitrification to partial nitrification-denitrification is considered as an efficient solution. In this article, the feasibility of combining free nitrous acid (FNA) sludge treatment and DO control to achieve partial nitrification-denitrification in a continuous flow system (aerobic-anoxic-oxic process) using real sewage was assessed. The nitrite pathway was rapidly established in the experimental reactor within 23 days by simultaneously lowering DO concentration in aerobic zone to 0.5 mg/L and treating 30% of the activated sludge per day from the reactor in the FNA sludge treatment unit with FNA concentration of 1.2 mg N/L and exposure time of 18 h. The nitrite oxidizing bacteria (NOB) were efficiently washed out and the partial nitrification process could maintain stable in the experimental reactor even after cease of FNA treatment and increase of DO concentrations in the main stream to 1.5 mg/L, with an average nitrite accumulation rate of above 78%. In contrast, the nitrite accumulation rate was just around 58% during low DO concentrations phase and declined quickly to below 1% after the DO concentrations were increased to 1.5 mg/L in the control reactor which only utilized single strategy of DO control to achieve nitrite pathway. Moreover, a better sludge settleability and nitrogen removal performance could also be realized in the experimental reactor. The results of nitrifying bacteria activities and quantities detection demonstrated that although NOB activities in both reactors were effectively inhibited, a certain amount of NOB (6.26 × 10 6 copies/g MLSS) were remained in the control reactor and multiplied rapidly as the DO concentration increased, which might break down the partial nitrification. Furthermore, the quantity results of nitrogen cycling related functional genes showed that the increment of the ratio of nitrate reduced bacteria to total bacteria was 0.35% larger than that of nitric oxide bacteria in the control reactor, while those two ratios increased similarly by 1.11% and 1.12% in the experimental reactor, respectively, which might be one potential cause of reduction in N2 O emission of nitrite pathway achieved by FNA-based technologies. Graphical abstract: Image 1 Highlights: Optimal FNA conc. + exposure time are determined to inactivate NOB and sustain AOB. Nitrite pathway is built by FNA sludge treatment + DO control in AAO process. High NAR and TN removal rate are achieved in long-term treating real sewage. FNA treatment + DO control reach better SVI + process stability than DO control. More nosZ genes are enriched by FNA treatment + DO control than DO control. … (more)
- Is Part Of:
- Water research. Volume 161(2019)
- Journal:
- Water research
- Issue:
- Volume 161(2019)
- Issue Display:
- Volume 161, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 161
- Issue:
- 2019
- Issue Sort Value:
- 2019-0161-2019-0000
- Page Start:
- 590
- Page End:
- 600
- Publication Date:
- 2019-09-15
- Subjects:
- Continuous process -- Low C/N real sewage -- Nitrite pathway -- Free nitrous acid -- DO control -- Bacteria community
Water -- Pollution -- Research -- Periodicals
363.7394 - Journal URLs:
- http://catalog.hathitrust.org/api/volumes/oclc/1769499.html ↗
http://www.sciencedirect.com/science/journal/00431354 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.watres.2019.06.040 ↗
- Languages:
- English
- ISSNs:
- 0043-1354
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9273.400000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 14777.xml