Factors influencing overbreak volumes in drill-and-blast tunnel excavation. A statistical analysis applied to the case study of the Brenner Base Tunnel – BBT. (November 2020)
- Record Type:
- Journal Article
- Title:
- Factors influencing overbreak volumes in drill-and-blast tunnel excavation. A statistical analysis applied to the case study of the Brenner Base Tunnel – BBT. (November 2020)
- Main Title:
- Factors influencing overbreak volumes in drill-and-blast tunnel excavation. A statistical analysis applied to the case study of the Brenner Base Tunnel – BBT
- Authors:
- Foderà, G.M.
Voza, A.
Barovero, G.
Tinti, F.
Boldini, D. - Abstract:
- Highlights: This paper investigates the overbreak in tunnels excavated with the drill-and-blast method. The study proposes an operative methodology to estimate the overbreak volumes. The technical overbreak can be distinguished from the geological overbreak from the inspection of the excavated surfaces. The approach was implemented during the construction of a portion of the Brenner Base Tunnel. An empirical model for overbreak prediction, based on the Rock Mass Rating index and the length of blast-holes, is proposed. Abstract: This paper deals with the analysis of overbreak in tunnels excavated with the drill-and-blast method. The overbreak phenomenon has many negative impacts on tunnelling organisation and economy and its precise assessment plays a fundamental role in the process of construction optimisation. The study proposes an operative methodology to estimate overbreak volumes and to distinguish so-called technical overbreak, mainly related to drill-and-blast design and execution, from geological overbreak, typically influenced by rock-mass characteristics. The approach was developed and implemented during the excavation of the Brenner Base Tunnel (BBT) and was based on the interpretation of tunnel laser scanning surveys and high-resolution images of the excavated surfaces. The analysis of more than 1, 800 m of excavation from three different tunnels of the BBT system allowed to identify the main factors influencing the technical and the geological overbreak. AnHighlights: This paper investigates the overbreak in tunnels excavated with the drill-and-blast method. The study proposes an operative methodology to estimate the overbreak volumes. The technical overbreak can be distinguished from the geological overbreak from the inspection of the excavated surfaces. The approach was implemented during the construction of a portion of the Brenner Base Tunnel. An empirical model for overbreak prediction, based on the Rock Mass Rating index and the length of blast-holes, is proposed. Abstract: This paper deals with the analysis of overbreak in tunnels excavated with the drill-and-blast method. The overbreak phenomenon has many negative impacts on tunnelling organisation and economy and its precise assessment plays a fundamental role in the process of construction optimisation. The study proposes an operative methodology to estimate overbreak volumes and to distinguish so-called technical overbreak, mainly related to drill-and-blast design and execution, from geological overbreak, typically influenced by rock-mass characteristics. The approach was developed and implemented during the excavation of the Brenner Base Tunnel (BBT) and was based on the interpretation of tunnel laser scanning surveys and high-resolution images of the excavated surfaces. The analysis of more than 1, 800 m of excavation from three different tunnels of the BBT system allowed to identify the main factors influencing the technical and the geological overbreak. An empirical model for overbreak prediction, based on the Rock Mass Rating index and the length of blast holes, is subsequently presented and validated in the last part of the paper. … (more)
- Is Part Of:
- Tunnelling and underground space technology. Volume 105(2020)
- Journal:
- Tunnelling and underground space technology
- Issue:
- Volume 105(2020)
- Issue Display:
- Volume 105, Issue 2020 (2020)
- Year:
- 2020
- Volume:
- 105
- Issue:
- 2020
- Issue Sort Value:
- 2020-0105-2020-0000
- Page Start:
- Page End:
- Publication Date:
- 2020-11
- Subjects:
- Brenner Base Tunnel -- Geological overbreak -- Technical overbreak -- Rock Mass Rating -- Blast hole length -- Statistical analysis
Tunneling -- Periodicals
Underground construction -- Periodicals
Tunnels -- Periodicals
Underground areas -- Periodicals
624.193 - Journal URLs:
- http://www.sciencedirect.com/science/journal/08867798 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.tust.2020.103475 ↗
- Languages:
- English
- ISSNs:
- 0886-7798
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9071.405000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 14402.xml