Cite

HARVARD Citation

    Qi, W. et al. (2020). Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv. Advances in civil engineering. p. . [Online]. 
  
Back to record