An improved operation strategy for CCHP system based on high-speed railways station case study. (15th July 2020)
- Record Type:
- Journal Article
- Title:
- An improved operation strategy for CCHP system based on high-speed railways station case study. (15th July 2020)
- Main Title:
- An improved operation strategy for CCHP system based on high-speed railways station case study
- Authors:
- Li, Yaohong
Tian, Ran
Wei, Mingshan
Xu, Fei
Zheng, Siyu
Song, Panpan
Yang, Bin - Abstract:
- Highlights: An improved operation strategy FBL was proposed. FBL was compared with FHL with gas turbine capacity optimization. FBL shows better performance than FHL in terms of all the criteria. A linear function between the CPM and thermoelectric ratio was developed. Abstract: Operation strategy significantly affects the economic and environmental performance of combined cooling, heating and power (CCHP) system. An improved strategy following balanced heat-electrical load (FBL), which includes three sub-strategies of various redundant energy, was proposed for a CCHP system with heat pump. The proposed FBL strategy was applied to a CCHP system in a high-speed railway station, and the performance of FBL strategy was compared with that of following hybrid electric-heating load (FHL) strategy. The optimal rated gas turbine capacity was optimized firstly under various strategies to guarantee the fairness of comparison. The primary energy consumption rate, CO2 emission reduction rate, operating cost savings rate and comprehensive performance matching (CPM) parameter of the CCHP system were adopted as criteria to evaluate the system performance. Results showed that all the criteria were improved by using FBL strategy with the CPMs of the three sub-strategies increasing 20.82%, 14.8% and 18.52% respectively. Secondly, high relevance was observed between CPM and the thermoelectric ratio. Based on analyses of other two typical loads of Harbin and Kunming, a linear function wasHighlights: An improved operation strategy FBL was proposed. FBL was compared with FHL with gas turbine capacity optimization. FBL shows better performance than FHL in terms of all the criteria. A linear function between the CPM and thermoelectric ratio was developed. Abstract: Operation strategy significantly affects the economic and environmental performance of combined cooling, heating and power (CCHP) system. An improved strategy following balanced heat-electrical load (FBL), which includes three sub-strategies of various redundant energy, was proposed for a CCHP system with heat pump. The proposed FBL strategy was applied to a CCHP system in a high-speed railway station, and the performance of FBL strategy was compared with that of following hybrid electric-heating load (FHL) strategy. The optimal rated gas turbine capacity was optimized firstly under various strategies to guarantee the fairness of comparison. The primary energy consumption rate, CO2 emission reduction rate, operating cost savings rate and comprehensive performance matching (CPM) parameter of the CCHP system were adopted as criteria to evaluate the system performance. Results showed that all the criteria were improved by using FBL strategy with the CPMs of the three sub-strategies increasing 20.82%, 14.8% and 18.52% respectively. Secondly, high relevance was observed between CPM and the thermoelectric ratio. Based on analyses of other two typical loads of Harbin and Kunming, a linear function was developed between the CPM and the load thermoelectric ratio, which can provide a direct and convenient method to evaluate the CCHP performance. Finally, the sensitivity analysis of the electricity price to gas price ratio indicated that the CCHP system was not applicable when the ratio was less than 1.79. The amount of redundant energy could not be adopted as a criterion for the system performance in the comparative analysis of various operation strategies, but the increasing redundancy energy led to the degradation of the system performance under the same operation strategy. … (more)
- Is Part Of:
- Energy conversion and management. Volume 216(2020)
- Journal:
- Energy conversion and management
- Issue:
- Volume 216(2020)
- Issue Display:
- Volume 216, Issue 2020 (2020)
- Year:
- 2020
- Volume:
- 216
- Issue:
- 2020
- Issue Sort Value:
- 2020-0216-2020-0000
- Page Start:
- Page End:
- Publication Date:
- 2020-07-15
- Subjects:
- Operation strategy -- Comprehensive performance matching -- CCHP system -- Thermoelectric ratio
Direct energy conversion -- Periodicals
Energy storage -- Periodicals
Energy transfer -- Periodicals
Énergie -- Conversion directe -- Périodiques
Direct energy conversion
Periodicals
621.3105 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01968904 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.enconman.2020.112936 ↗
- Languages:
- English
- ISSNs:
- 0196-8904
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.547000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 14221.xml