A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study. (October 2020)
- Record Type:
- Journal Article
- Title:
- A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study. (October 2020)
- Main Title:
- A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study
- Authors:
- Mirnezami, Seyed Ali
Mousavi, Seyed Meysam
Mohagheghi, Vahid - Abstract:
- Abstract: Managing project costs effectively, which comprises numerous aspects, is a highly complicated process for project managers that needs dependable cash knowledge in the entire life cycle of the project. Project managers' proficiency and anticipating dependable cash flows lead to substantial improvements in project costs management. Moreover, healthy cash flow prognostication for the whole construction project gives project managers a real insight into the identification of problems, and its deficiency results in the failure of firms even with big profits to maintain themselves as well. Therefore, predicting reliable cash flow and monitoring the progress of projects in terms of cash are essential to be considered. Furthermore, due to the existence of uncertainties in projects, it is necessary to find it as a significant part of different approaches. Building upon these, an innovative approach is presented in this paper to prognosticate project cash flow based on both type-2 fuzzy extension of dependency structure matrix for project scheduling with overlapping activities and extended alternative queuing method under type-2 fuzzy environment to adopt the best scenario. Moreover, type-2 fuzzy numbers are applied to address the uncertainty of activities. Subsequently, a real case study of a gas field development project is employed to represent the efficiency of proposed approach. Ultimately, a comparative study is conducted to validate the results, and superiorities ofAbstract: Managing project costs effectively, which comprises numerous aspects, is a highly complicated process for project managers that needs dependable cash knowledge in the entire life cycle of the project. Project managers' proficiency and anticipating dependable cash flows lead to substantial improvements in project costs management. Moreover, healthy cash flow prognostication for the whole construction project gives project managers a real insight into the identification of problems, and its deficiency results in the failure of firms even with big profits to maintain themselves as well. Therefore, predicting reliable cash flow and monitoring the progress of projects in terms of cash are essential to be considered. Furthermore, due to the existence of uncertainties in projects, it is necessary to find it as a significant part of different approaches. Building upon these, an innovative approach is presented in this paper to prognosticate project cash flow based on both type-2 fuzzy extension of dependency structure matrix for project scheduling with overlapping activities and extended alternative queuing method under type-2 fuzzy environment to adopt the best scenario. Moreover, type-2 fuzzy numbers are applied to address the uncertainty of activities. Subsequently, a real case study of a gas field development project is employed to represent the efficiency of proposed approach. Ultimately, a comparative study is conducted to validate the results, and superiorities of the proposed approach are addressed from different aspects. The results illustrate that the presented approach is capable of handling real project problems and providing project managers with a suitable tool to comprehend the cash conditions of the projects. Highlights: Developing a novel DSM method under TIT2FSs to address uncertainties. Proposing a new comprehensive approach to generate project cash flow. Taking a set of effective criteria, e.g., cost, quality, and safety criteria. Proposing a new satisfaction degree based an algorithm under TIT2FSs. … (more)
- Is Part Of:
- Engineering applications of artificial intelligence. Volume 95(2020)
- Journal:
- Engineering applications of artificial intelligence
- Issue:
- Volume 95(2020)
- Issue Display:
- Volume 95, Issue 2020 (2020)
- Year:
- 2020
- Volume:
- 95
- Issue:
- 2020
- Issue Sort Value:
- 2020-0095-2020-0000
- Page Start:
- Page End:
- Publication Date:
- 2020-10
- Subjects:
- Project management -- Cash flow analysis -- Dependency structure matrix -- Trapezoidal interval type-2 fuzzy sets -- Alternative queuing method
Engineering -- Data processing -- Periodicals
Artificial intelligence -- Periodicals
Expert systems (Computer science) -- Periodicals
Ingénierie -- Informatique -- Périodiques
Intelligence artificielle -- Périodiques
Systèmes experts (Informatique) -- Périodiques
Artificial intelligence
Engineering -- Data processing
Expert systems (Computer science)
Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/09521976 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.engappai.2020.103815 ↗
- Languages:
- English
- ISSNs:
- 0952-1976
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3755.704500
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 14012.xml