A comprehensive evaluation of the treatment of lead in MSWI fly ash by the combined cement solidification and phosphate stabilization process. (1st August 2020)
- Record Type:
- Journal Article
- Title:
- A comprehensive evaluation of the treatment of lead in MSWI fly ash by the combined cement solidification and phosphate stabilization process. (1st August 2020)
- Main Title:
- A comprehensive evaluation of the treatment of lead in MSWI fly ash by the combined cement solidification and phosphate stabilization process
- Authors:
- Chen, Weiming
Wang, Fan
Li, Zhi
Li, Qibin - Abstract:
- Highlights: Solidification and stabilization effect of Pb in MSWI fly ash was compared. Pb leaching concentration, volume change ratio, and treatment cost were evaluated. Combined solidification-stabilization process yielded the best treatment effect. Optimal parameters are obtained through response surface methodology. Abstract: Fly ash is a hazardous material that is produced from municipal solid waste incineration. It contains heavy metals and should be properly treated to meet landfill entry requirements. In this study, under the precondition that the leachable concentration of lead (Pb) exceeded the limit value for landfill disposal, the effects of cement solidification, chemical stabilization, and their combination on the leachable Pb concentration and the chemical state of Pb were systematically investigated. In addition, the reaction conditions were optimized by response surface methodology (RSM) in terms of leachable Pb concentration, volume change ratio, and treatment cost. The results indicated that the leachable Pb concentration decreased at lower cement or sodium dihydrogen phosphate (NaH2 PO4 ) dosages in cement solidification or NaH2 PO4 stabilization, and the liquid-to-solid ratio had a significant influence on cement solidification. The leachable Pb concentration met the limit value for landfill disposal in the individual processes with 20% cement or 5% NaH2 PO4, and in the combined process with 10% cement + 2% NaH2 PO4 . The combined process achieved theHighlights: Solidification and stabilization effect of Pb in MSWI fly ash was compared. Pb leaching concentration, volume change ratio, and treatment cost were evaluated. Combined solidification-stabilization process yielded the best treatment effect. Optimal parameters are obtained through response surface methodology. Abstract: Fly ash is a hazardous material that is produced from municipal solid waste incineration. It contains heavy metals and should be properly treated to meet landfill entry requirements. In this study, under the precondition that the leachable concentration of lead (Pb) exceeded the limit value for landfill disposal, the effects of cement solidification, chemical stabilization, and their combination on the leachable Pb concentration and the chemical state of Pb were systematically investigated. In addition, the reaction conditions were optimized by response surface methodology (RSM) in terms of leachable Pb concentration, volume change ratio, and treatment cost. The results indicated that the leachable Pb concentration decreased at lower cement or sodium dihydrogen phosphate (NaH2 PO4 ) dosages in cement solidification or NaH2 PO4 stabilization, and the liquid-to-solid ratio had a significant influence on cement solidification. The leachable Pb concentration met the limit value for landfill disposal in the individual processes with 20% cement or 5% NaH2 PO4, and in the combined process with 10% cement + 2% NaH2 PO4 . The combined process achieved the best treatment efficiency by enabling Pb to transform to a stable residual state. According to the RSM, a combined cement content of 11.64%, NaH2 PO4 content of 2.79%, and liquid-to-solid ratio of 0.48 were the optimal parameters, resulting in substantial decreases in the volume change ratio and treatment costs, while satisfying the preconditions for landfill disposal. In conclusion, the combined process can reduce the pollution risk to the environment, and is an efficient and cost-effective pre-treatment method for incinerator fly ash. … (more)
- Is Part Of:
- Waste management. Volume 114(2020)
- Journal:
- Waste management
- Issue:
- Volume 114(2020)
- Issue Display:
- Volume 114, Issue 2020 (2020)
- Year:
- 2020
- Volume:
- 114
- Issue:
- 2020
- Issue Sort Value:
- 2020-0114-2020-0000
- Page Start:
- 107
- Page End:
- 114
- Publication Date:
- 2020-08-01
- Subjects:
- Heavy metals -- Solidification -- Stabilization -- Coefficient treatment -- Response surface methodology
Hazardous wastes -- Periodicals
Refuse and refuse disposal -- Periodicals
363.728 - Journal URLs:
- http://www.sciencedirect.com/science/journal/0956053X ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.wasman.2020.06.041 ↗
- Languages:
- English
- ISSNs:
- 0956-053X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9266.674500
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13697.xml