Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia. Issue 5 (2nd September 2020)
- Record Type:
- Journal Article
- Title:
- Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia. Issue 5 (2nd September 2020)
- Main Title:
- Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia
- Authors:
- Che Ibrahim, Che Khairil Izam
Rahmat, Arina
Belayutham, Sheila
Costello, Seosamh B. - Abstract:
- Abstract: The importance of measuring the integration practices in temporary multiorganizations (TMOs) has been emphasized in the construction literature. In order to address this gap, five rounds of Delphi questionnaire survey have been conducted with 24 construction experts in Malaysia, in order to identify the most significant key determinants (KDs) of TMO integration practice. The results reveal that the top five weighted KDs to evaluate TMO integration practice were: (1) commitment from top management; (2) team leadership; (3) focusing on goals and objectives; (4) effective communication; (5) trust and respect. A conceptual TMO integration performance index was then developed based on the identified KDs and their relative weightings. This study found that in order for TMO integration practice to be successful, more attention should be placed on the behavioural construct of the TMOs. It is expected that the index would allow improved conceptualization and measurement of TMO integration practice, which is in line with the long-term national policy on construction reform through collaborative initiatives. This study expands the current frontiers of objective assessment for TMO integration and strengthening construction professionals' understanding on measuring organizational integration. In addition, the methodology adopted could be replicated in other countries to produce similar indices for international comparison.
- Is Part Of:
- International journal of construction management. Volume 20:Issue 5(2020)
- Journal:
- International journal of construction management
- Issue:
- Volume 20:Issue 5(2020)
- Issue Display:
- Volume 20, Issue 5 (2020)
- Year:
- 2020
- Volume:
- 20
- Issue:
- 5
- Issue Sort Value:
- 2020-0020-0005-0000
- Page Start:
- 412
- Page End:
- 428
- Publication Date:
- 2020-09-02
- Subjects:
- Temporary multi-organisations -- integrationDelphi -- construction -- Malaysia
Building -- Periodicals
Construction industry -- Periodicals
690 - Journal URLs:
- http://www.tandfonline.com/toc/tjcm20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/15623599.2018.1484865 ↗
- Languages:
- English
- ISSNs:
- 1562-3599
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13689.xml