Cite
HARVARD Citation
Wang, Q. et al. (2020). A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource. Engineering optimization. 52 (5), pp. 798-816. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Wang, Q. et al. (2020). A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource. Engineering optimization. 52 (5), pp. 798-816. [Online].