Accounting for reserve capacity activation when scheduling a hydropower dominated system. (July 2020)
- Record Type:
- Journal Article
- Title:
- Accounting for reserve capacity activation when scheduling a hydropower dominated system. (July 2020)
- Main Title:
- Accounting for reserve capacity activation when scheduling a hydropower dominated system
- Authors:
- Naversen, Christian Øyn
Farahmand, Hossein
Helseth, Arild - Abstract:
- Highlights: Reserve capacity activation is explicitly modelled for hydropower plants. A new hybrid stochastic-robust optimization model is formulated. The column-and-constraint generation technique is used to create extreme scenarios. The new hybrid model is compared to the standard stochastic and robust formulations. Abstract: As the penetration of variable renewable power generation increases in power systems around the world, system security is challenged. It is crucial to coordinate the available flexible generating resources, such as hydropower, to meet the need for system balancing. However, reserved capacity on hydropower plants should only be activated if there is sufficient energy or storage capacity to either increase or decrease production. The potential change in production will also affect all reservoirs and plants connected by the cascaded topology. These issues are largely ignored or simplified in hydropower reserve scheduling models. To properly account for the possible activation of reserved capacity, several two-stage model formulations based on stochastic and robust optimization are presented and compared in this paper. The uncertainty in net load deviations due to forecasting errors in renewable power generation is considered the source of reserve capacity activation. The case study based on a real Norwegian watercourse clearly shows the benefit of using any of the two-stage model solutions over the standard deterministic reserve procurement. A novelHighlights: Reserve capacity activation is explicitly modelled for hydropower plants. A new hybrid stochastic-robust optimization model is formulated. The column-and-constraint generation technique is used to create extreme scenarios. The new hybrid model is compared to the standard stochastic and robust formulations. Abstract: As the penetration of variable renewable power generation increases in power systems around the world, system security is challenged. It is crucial to coordinate the available flexible generating resources, such as hydropower, to meet the need for system balancing. However, reserved capacity on hydropower plants should only be activated if there is sufficient energy or storage capacity to either increase or decrease production. The potential change in production will also affect all reservoirs and plants connected by the cascaded topology. These issues are largely ignored or simplified in hydropower reserve scheduling models. To properly account for the possible activation of reserved capacity, several two-stage model formulations based on stochastic and robust optimization are presented and compared in this paper. The uncertainty in net load deviations due to forecasting errors in renewable power generation is considered the source of reserve capacity activation. The case study based on a real Norwegian watercourse clearly shows the benefit of using any of the two-stage model solutions over the standard deterministic reserve procurement. A novel hybrid stochastic-robust model formulation is presented and shown to efficiently increase the robustness of the solution without notably increasing the reserve procurement cost compared to the stochastic and robust models. … (more)
- Is Part Of:
- International journal of electrical power & energy systems. Volume 119(2020)
- Journal:
- International journal of electrical power & energy systems
- Issue:
- Volume 119(2020)
- Issue Display:
- Volume 119, Issue 2020 (2020)
- Year:
- 2020
- Volume:
- 119
- Issue:
- 2020
- Issue Sort Value:
- 2020-0119-2020-0000
- Page Start:
- Page End:
- Publication Date:
- 2020-07
- Subjects:
- Activation of reserved capacity -- Hydropower scheduling -- Hybrid stochastic-robust optimization
Electrical engineering -- Periodicals
Electric power systems -- Periodicals
Électrotechnique -- Périodiques
Réseaux électriques (Énergie) -- Périodiques
Electric power systems
Electrical engineering
Periodicals
621.3 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01420615 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.ijepes.2020.105864 ↗
- Languages:
- English
- ISSNs:
- 0142-0615
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.220000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13464.xml