Construction worker productivity in hot and humid weather conditions: A review of measurement methods at task, crew and project levels. Issue 1 (22nd July 2019)
- Record Type:
- Journal Article
- Title:
- Construction worker productivity in hot and humid weather conditions: A review of measurement methods at task, crew and project levels. Issue 1 (22nd July 2019)
- Main Title:
- Construction worker productivity in hot and humid weather conditions
- Authors:
- Moohialdin, Ammar Saeed Mohammed
Lamari, Fiona
Miska, Marc
Trigunarsyah, Bambang - Abstract:
- Abstract : Purpose: The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers. Design/methodology/approach: This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs. Findings: Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs. Originality/value: TheAbstract : Purpose: The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers. Design/methodology/approach: This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs. Findings: Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs. Originality/value: The comprehensive literature review makes an original contribution to WP measurements filed in HHWCs in the construction industry. Results of this review provide researchers and practitioners with an insight into challenges associated with the measurements methods and solving practical site measurements issues. The findings will also enable the researchers and practitioners to bridge the identified research gaps in this research field and enhance the ability to provide accurate measures in HHWCs. The proposed research framework may promote potential improvements in the productivity measurements methods, which support researchers and practitioners in developing new innovative methods in HHWCs with the integration of the most recent monitoring technologies. … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 27:Issue 1(2020)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 27:Issue 1(2020)
- Issue Display:
- Volume 27, Issue 1 (2020)
- Year:
- 2020
- Volume:
- 27
- Issue:
- 1
- Issue Sort Value:
- 2020-0027-0001-0000
- Page Start:
- 83
- Page End:
- 108
- Publication Date:
- 2019-07-22
- Subjects:
- Technology -- Construction -- Integration -- Project management -- Productivity -- Construction site
Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-05-2018-0191 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13079.xml