Optimum location and relocation plan of semi-mobile in-pit crushing and conveying systems in open-pit mines by transportation problem. Issue 5 (4th July 2019)
- Record Type:
- Journal Article
- Title:
- Optimum location and relocation plan of semi-mobile in-pit crushing and conveying systems in open-pit mines by transportation problem. Issue 5 (4th July 2019)
- Main Title:
- Optimum location and relocation plan of semi-mobile in-pit crushing and conveying systems in open-pit mines by transportation problem
- Authors:
- Abbaspour, Hossein
Drebenstedt, Carsten
Paricheh, Morteza
Ritter, Robert - Abstract:
- Abstract: In-pit crushing and conveying (IPCC) systems have attracted more interest among miners as an alternative to the conventional truck-shovel transportation system. The semi-mobile IPCC (SMIPCC) system is a well-suited type of IPCC system in open-pit mining projects because of its relocation nature. However, it is very important to design its optimum location and relocation plan in a manner that minimises the operating costs. In spite of a few previous works, which propose methods for optimum location and time in order to shift from a truck-shovel system to an IPCC system, a combined optimum location and relocation plan of the SMIPCC has not been investigated. This paper defines the optimum location and relocation plan of the SMIPCC in the context of a transportation problem with different 'year levels' as the sources and 'levels' as the destinations. This model is able to calculate the optimum solution simultaneously in the case of both location (level) and time (year level). The results show that this method can efficiently be applied as a planning tool for optimising operating and relocation costs, and the location and relocation plan of the SMIPCC.
- Is Part Of:
- International journal of mining, reclamation and environment. Volume 33:Issue 5(2019)
- Journal:
- International journal of mining, reclamation and environment
- Issue:
- Volume 33:Issue 5(2019)
- Issue Display:
- Volume 33, Issue 5 (2019)
- Year:
- 2019
- Volume:
- 33
- Issue:
- 5
- Issue Sort Value:
- 2019-0033-0005-0000
- Page Start:
- 297
- Page End:
- 317
- Publication Date:
- 2019-07-04
- Subjects:
- Open-pit mine -- semi-mobile in-pit crushing and conveying (SMIPCC) system -- transportation problem -- optimum location -- relocation plan -- operating costs
Mining engineering -- Periodicals
Mineral industries -- Environmental aspects -- Periodicals
Abandoned mined lands reclamation -- Periodicals
622.292 - Journal URLs:
- http://www.tandfonline.com/toc/nsme20/current ↗
http://www.tandf.co.uk/journals/titles/17480930.asp ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/17480930.2018.1435968 ↗
- Languages:
- English
- ISSNs:
- 1748-0930
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.364300
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 13066.xml