Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints. (June 2018)
- Record Type:
- Journal Article
- Title:
- Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints. (June 2018)
- Main Title:
- Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints
- Authors:
- Feng, Jianguang
Chu, Chengbin
Che, Ada - Abstract:
- Highlights: We study a cyclic jobshop hoist scheduling problem with multi-capacity reentrant tanks. Parts are processed in a set of tanks with time-window constraints. The constraints related to tank capacity and time-window are analyzed. A novel mixed-integer programming model is developed. Computational experiments indicate the efficiency of the proposed model. Abstract: This paper studies the cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints. Parts of different types are processed in a series of tanks with bounded processing times. Multi-capacity tanks are used to handle stages with long processing times. Tanks can be reentrant so that a part visits them more than once. A hoist is responsible for the transportation of parts between tanks. We consider the cyclic scheduling where multiple parts enter and leave the production line during a cycle. The difficulty to deal with the problem lies in how to effectively handle the constraints related to multi-capacity reentrant tanks and their relations with time windows. To this end, a mixed-integer linear programming model is developed by addressing the time-window constraints and tank capacity constraints in a novel way. Computational experiments are conducted to demonstrate the effectiveness of the proposed model.
- Is Part Of:
- Computers & industrial engineering. Volume 120(2018)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 120(2018)
- Issue Display:
- Volume 120, Issue 2018 (2018)
- Year:
- 2018
- Volume:
- 120
- Issue:
- 2018
- Issue Sort Value:
- 2018-0120-2018-0000
- Page Start:
- 382
- Page End:
- 391
- Publication Date:
- 2018-06
- Subjects:
- Cyclic jobshop scheduling -- Hoist scheduling -- Multi-capacity reentrant tanks -- Mixed-integer linear programming
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2018.04.046 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13020.xml