Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods. (June 2018)
- Record Type:
- Journal Article
- Title:
- Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods. (June 2018)
- Main Title:
- Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods
- Authors:
- Dorfeshan, Y.
Mousavi, S. Meysam
Mohagheghi, V.
Vahdani, B. - Abstract:
- Highlights: Considering time, cost, risk, quality and safety on critical paths determination. Introducing a new extension of MULTIMOORA under IT2FS uncertainty. Proposing a new extension of MOOSRA method under IT2FS uncertainty. Presenting a new TPOP method under type-2 fuzzy uncertainty to aggregate rankings. Enhancing reference point considerations in MULTIMOORA method. Abstract: In this paper, a novel decision methodology of critical path determination is introduced that not only considers project time but also considers project cost, risk, quality and safety. To address uncertain project environment, interval type-2 fuzzy sets (IT2FSs) are presented in the proposed decision methodology. The ratings of each activity and the weight of each criterion are described by IT2F-numbers. To address this multi-criteria decision problem, a new version of MULTIMOORA and MOOSRA methods are extended to IT2F-uncertainty and are used to determine project's critical paths. In addition to addressing IT2FSs, the method is enhanced by replacing the commonly applied dominance theory by a new version of multi-approaches multi-criteria decision-making technique, namely technique of precise order preference (TPOP). Finally, in order to display the applicability of the presented methodology, an existing case study from the literature to aircraft prototype batch is adopted and solved. Furthermore, a case study of construction project is solved by proposed methodology. Also, sensitivity analysisHighlights: Considering time, cost, risk, quality and safety on critical paths determination. Introducing a new extension of MULTIMOORA under IT2FS uncertainty. Proposing a new extension of MOOSRA method under IT2FS uncertainty. Presenting a new TPOP method under type-2 fuzzy uncertainty to aggregate rankings. Enhancing reference point considerations in MULTIMOORA method. Abstract: In this paper, a novel decision methodology of critical path determination is introduced that not only considers project time but also considers project cost, risk, quality and safety. To address uncertain project environment, interval type-2 fuzzy sets (IT2FSs) are presented in the proposed decision methodology. The ratings of each activity and the weight of each criterion are described by IT2F-numbers. To address this multi-criteria decision problem, a new version of MULTIMOORA and MOOSRA methods are extended to IT2F-uncertainty and are used to determine project's critical paths. In addition to addressing IT2FSs, the method is enhanced by replacing the commonly applied dominance theory by a new version of multi-approaches multi-criteria decision-making technique, namely technique of precise order preference (TPOP). Finally, in order to display the applicability of the presented methodology, an existing case study from the literature to aircraft prototype batch is adopted and solved. Furthermore, a case study of construction project is solved by proposed methodology. Also, sensitivity analysis and comparative analysis are carried out, and the results are discussed. The validity of the proposed methodology is confirmed by solving two decision methods of the recent literature. Furthermore, the sensitivity analysis illustrates that the critical path of the project is approximately insensitive to weights of new MULTIMOORA method's main parts. … (more)
- Is Part Of:
- Computers & industrial engineering. Volume 120(2018)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 120(2018)
- Issue Display:
- Volume 120, Issue 2018 (2018)
- Year:
- 2018
- Volume:
- 120
- Issue:
- 2018
- Issue Sort Value:
- 2018-0120-2018-0000
- Page Start:
- 160
- Page End:
- 178
- Publication Date:
- 2018-06
- Subjects:
- Project critical path -- Interval type-2 fuzzy sets (IT2FSs) -- MULTIMOORA method -- TPOP method -- MOOSRA method -- Aircraft prototype batch -- Construction project
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2018.04.015 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 13020.xml