Cite
HARVARD Citation
Li, Y. et al. (2020). A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time. Engineering optimization. 52 (3), pp. 484-506. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Li, Y. et al. (2020). A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time. Engineering optimization. 52 (3), pp. 484-506. [Online].