Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy. (December 2019)
- Record Type:
- Journal Article
- Title:
- Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy. (December 2019)
- Main Title:
- Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy
- Authors:
- Gorman, Will
Mills, Andrew
Wiser, Ryan - Abstract:
- Abstract: Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is $1–$10/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of $29–$56/MWh for utility-scale wind and $36–$46/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems.Abstract: Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is $1–$10/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of $29–$56/MWh for utility-scale wind and $36–$46/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems. Highlights: Estimating the cost of transmission to integrate renewable energy is challenging. We use interconnection, actual project, and simulation data to bound cost estimate. The average levelized transmission capital cost for renewable energy is $1-$10/MWh. The costs contextualize the benefits of transmission avoidance/deferral in policy. Policy makers can use costs to evaluate public transmission investments. … (more)
- Is Part Of:
- Energy policy. Volume 135(2019)
- Journal:
- Energy policy
- Issue:
- Volume 135(2019)
- Issue Display:
- Volume 135, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 135
- Issue:
- 2019
- Issue Sort Value:
- 2019-0135-2019-0000
- Page Start:
- Page End:
- Publication Date:
- 2019-12
- Subjects:
- Transmission investment -- Renewable energy -- Wind -- Utility solar -- Levelized cost of energy
Energy policy -- Periodicals
Politique énergétique -- Périodiques
Electronic journals
333.79 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03014215 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.enpol.2019.110994 ↗
- Languages:
- English
- ISSNs:
- 0301-4215
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.720000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 12458.xml