Modification of Vertical Earth Pressure Formulas for High Fill Cut-and-Cover Tunnels Using Experimental and Numerical Methods. (18th July 2019)
- Record Type:
- Journal Article
- Title:
- Modification of Vertical Earth Pressure Formulas for High Fill Cut-and-Cover Tunnels Using Experimental and Numerical Methods. (18th July 2019)
- Main Title:
- Modification of Vertical Earth Pressure Formulas for High Fill Cut-and-Cover Tunnels Using Experimental and Numerical Methods
- Authors:
- Li, Sheng
Ma, Li
Ho, I-Hsuan
Wang, Qicai
Yu, Bentian
Zhou, Peng - Other Names:
- Ghadimi Parviz Academic Editor.
- Abstract:
- Abstract : The high-filled cut-and-cover tunnel (HFCCT) is a solution to reclaim more useable lands due to the unique landforms of Loess Plateau in northwestern China. Because of the ultrahigh backfill, the estimation of vertical earth pressure will significantly affect the design and safety of the cut-and-cover tunnel (CCT). The current methods for estimating the vertical earth pressure are either to overestimate or underestimate the vertical earth pressure on the top of HFCCT. To more precisely estimate the vertical earth pressure distribution, the vertical earth pressure based on the soil column pressure, γh ( h : the height of backfill above the CCT), needs to be properly modified. Considering different influential factors, four corresponding coefficients are proposed:k 0 : cross-sectional shape of CCT effect, k 1 : stiffness of backfill effect, k 2 : width of CCT effect, andk 3 : coupling effect of slope angle, θ, and the ratio of B/D. It is found thatk 0 has little influence; thek 3 andk 1 reduce andk 2 amplifies the γh . The corresponding general forms for these coefficients are determined based on finite element analysis results. A general equation for estimating vertical earth pressure for the HFCCT including these four coefficients is proposed. Meanwhile, this general form is verified by the numerical analysis results and experimental results for different cases. Therefore, this proposed equation is applicable to estimate the vertical earth pressure for existing orAbstract : The high-filled cut-and-cover tunnel (HFCCT) is a solution to reclaim more useable lands due to the unique landforms of Loess Plateau in northwestern China. Because of the ultrahigh backfill, the estimation of vertical earth pressure will significantly affect the design and safety of the cut-and-cover tunnel (CCT). The current methods for estimating the vertical earth pressure are either to overestimate or underestimate the vertical earth pressure on the top of HFCCT. To more precisely estimate the vertical earth pressure distribution, the vertical earth pressure based on the soil column pressure, γh ( h : the height of backfill above the CCT), needs to be properly modified. Considering different influential factors, four corresponding coefficients are proposed:k 0 : cross-sectional shape of CCT effect, k 1 : stiffness of backfill effect, k 2 : width of CCT effect, andk 3 : coupling effect of slope angle, θ, and the ratio of B/D. It is found thatk 0 has little influence; thek 3 andk 1 reduce andk 2 amplifies the γh . The corresponding general forms for these coefficients are determined based on finite element analysis results. A general equation for estimating vertical earth pressure for the HFCCT including these four coefficients is proposed. Meanwhile, this general form is verified by the numerical analysis results and experimental results for different cases. Therefore, this proposed equation is applicable to estimate the vertical earth pressure for existing or newly designed HFCCT. Furthermore, this proposed method can significantly reduce the computational work in engineering analysis. … (more)
- Is Part Of:
- Mathematical problems in engineering. Volume 2019(2019)
- Journal:
- Mathematical problems in engineering
- Issue:
- Volume 2019(2019)
- Issue Display:
- Volume 2019, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 2019
- Issue:
- 2019
- Issue Sort Value:
- 2019-2019-2019-0000
- Page Start:
- Page End:
- Publication Date:
- 2019-07-18
- Subjects:
- Engineering mathematics -- Periodicals
510.2462 - Journal URLs:
- https://www.hindawi.com/journals/mpe/ ↗
http://www.gbhap-us.com/journals/238/238-top.htm ↗ - DOI:
- 10.1155/2019/8257157 ↗
- Languages:
- English
- ISSNs:
- 1024-123X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 11762.xml