Chaoyang Bridge, China: a double-deck cable-stayed bridge with corrugated steel webs. Issue 1 (7th August 2018)
- Record Type:
- Journal Article
- Title:
- Chaoyang Bridge, China: a double-deck cable-stayed bridge with corrugated steel webs. Issue 1 (7th August 2018)
- Main Title:
- Chaoyang Bridge, China: a double-deck cable-stayed bridge with corrugated steel webs.
- Authors:
- Deng, Wenqin
Zhang, Jiandong
Liu, Duo
Hu, Jun
Hu, Fangjian
Zhong, Zhibing - Abstract:
- Abstract : Completed in 2016, Chaoyang Bridge in China is the world's first double-deck composite girder cable-stayed bridge with corrugated steel webs. It provides a dual four-lane highway above with cantilevered footways and cycleways below. As described in this paper, the bridge features several design innovations. These include the first use of corrugated steel webs for a cable-stayed double-deck crossing, new cable anchorage technology and a building information modelling management system to resolve structural defects.
- Is Part Of:
- Proceedings of ICE. Volume 172:Issue 1(2019)
- Journal:
- Proceedings of ICE
- Issue:
- Volume 172:Issue 1(2019)
- Issue Display:
- Volume 172, Issue 1 (2019)
- Year:
- 2019
- Volume:
- 172
- Issue:
- 1
- Issue Sort Value:
- 2019-0172-0001-0000
- Page Start:
- 45
- Page End:
- 48
- Publication Date:
- 2018-08-07
- Subjects:
- bridges -- buildings, structures & design -- composite structures
Civil engineering -- Periodicals
624 - Journal URLs:
- https://www.icevirtuallibrary.com/journal/jcien ↗
- DOI:
- 10.1680/jcien.18.00018 ↗
- Languages:
- English
- ISSNs:
- 0965-089X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 11663.xml