Dunaj, Pawel - Abstract:
- Abstract: The work describes the actions taken as a result of an unforeseen disaster of a shopping facility that had been in operation for several decades. A considerable part of the facility's roof structure unexpectedly collapsed under the impact of a snow layer, whose thickness did not exceed the limit value specified in the current regulations. The roofing was made of steel segmental truss girders (4 × 6 m) with a span of 24 m, joined together by bolts and welds. After securing the facility against a possibility of further collapse, the extent of the damage was investigated. An attempt was made to identify faults in the structural elements and in the connections made several years earlier, as well as possible mistakes made during the modernization works several months before the disaster. The actual strength parameters of the steel structural elements and joints were determined. The effort of basic structural elements was analyzed, with particular emphasis on the state of connections of successive segments of the damaged girders. The causes of the disaster were determined. The work is concluded by presenting a concept and conditions for lifting and reconstructing the damaged roof. It is worth highlighting that the roof was lifted as a whole, without the need to disassemble purlins, steel sheets and insulation. The advantages and disadvantages of different types of butt joints used in the construction were evaluated. Making use of the results of the investigation, theAbstract: The work describes the actions taken as a result of an unforeseen disaster of a shopping facility that had been in operation for several decades. A considerable part of the facility's roof structure unexpectedly collapsed under the impact of a snow layer, whose thickness did not exceed the limit value specified in the current regulations. The roofing was made of steel segmental truss girders (4 × 6 m) with a span of 24 m, joined together by bolts and welds. After securing the facility against a possibility of further collapse, the extent of the damage was investigated. An attempt was made to identify faults in the structural elements and in the connections made several years earlier, as well as possible mistakes made during the modernization works several months before the disaster. The actual strength parameters of the steel structural elements and joints were determined. The effort of basic structural elements was analyzed, with particular emphasis on the state of connections of successive segments of the damaged girders. The causes of the disaster were determined. The work is concluded by presenting a concept and conditions for lifting and reconstructing the damaged roof. It is worth highlighting that the roof was lifted as a whole, without the need to disassemble purlins, steel sheets and insulation. The advantages and disadvantages of different types of butt joints used in the construction were evaluated. Making use of the results of the investigation, the recommendations concerning the design, construction and operation of public facilities were formulated and relayed to participants of the investment process. Graphical abstract: Unlabelled Image Highlights: The actions taken after an unexpected collapse of a roofing of a shopping facility were described. The collapsed roofing structure was made of steel segment girders joined by bolts and welds. The thickness of the snow layer did not exceed the limit value. The weakest element in the structure turned out to be a central connection in the lower belt. A reconstruction concept of the damaged roofing cover was presented. … (more)
- Is Part Of:
- Engineering failure analysis. Volume 98(2019)
- Journal:
- Engineering failure analysis
- Issue:
- Volume 98(2019)
- Issue Display:
- Volume 98, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 98
- Issue:
- 2019
- Issue Sort Value:
- 2019-0098-2019-0000
- Page Start:
- 72
- Page End:
- 82
- Publication Date:
- 2019-04
- Subjects:
- Truss girder -- Snow load -- Bolted joints -- Collapse -- Reconstruction
System failures (Engineering) -- Periodicals
Fracture mechanics -- Periodicals
Reliability (Engineering) -- Periodicals
Pannes -- Périodiques
Rupture, Mécanique de la -- Périodiques
Fiabilité -- Périodiques
Fracture mechanics
Reliability (Engineering)
System failures (Engineering)
Periodicals
Electronic journals
620.112 - Journal URLs:
- http://www.sciencedirect.com/science/journal/13506307 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.engfailanal.2019.01.082 ↗
- Languages:
- English
- ISSNs:
- 1350-6307
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3760.991000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 11571.xml