Revisiting reliability of estimates at completion for department of defense contracts. Issue 3 (2nd September 2019)
- Record Type:
- Journal Article
- Title:
- Revisiting reliability of estimates at completion for department of defense contracts. Issue 3 (2nd September 2019)
- Main Title:
- Revisiting reliability of estimates at completion for department of defense contracts
- Authors:
- Kim, Deborah B.
White, Edward D.
Ritschel, Jonathan D.
Millette, Chad A. - Abstract:
- Abstract : Purpose: Within earned value management, the cost performance index (CPI) and the critical ratio (CR) are used to generate the estimates at completion (EACs). According to the research in the 1990s, estimating the final contract's cost at completion (CAC) using EACCR is a quicker predictor of the actual final cost versus using EACCPI . This paper aims to investigate whether this trend stills holds for modern department of defense contracts. Design/methodology/approach: Accessing the Cost Assessment Data Enterprise (CADE) database, 451 contracts consisting of 863 contract line item numbers (CLINs) were initially retrieved and analyzed in three stages. The first replicated the work conducted in 1990s. The second stage entailed calculating 95 per cent confidence intervals and hypothesis tests regarding percentage accuracy of EACs for a contract's final CAC. Lastly, regression analysis was conducted to characterize major, moderate and minor influencers on EAC reliability. Findings: For modern contracts, EACCR aligns more with EACCPI and no longer demonstrates early accuracy of a contract's final CAC. Contract percentage completion strongly reduced the per cent error of estimating CAC, while cost-plus-fixed-fee contracts and those with no work breakdown structure greater than Level 2 negatively affected accuracy. Social implications: To militate against optimism of early assessment of a contract's true cost. Originality/value: This paper provides empirical evidenceAbstract : Purpose: Within earned value management, the cost performance index (CPI) and the critical ratio (CR) are used to generate the estimates at completion (EACs). According to the research in the 1990s, estimating the final contract's cost at completion (CAC) using EACCR is a quicker predictor of the actual final cost versus using EACCPI . This paper aims to investigate whether this trend stills holds for modern department of defense contracts. Design/methodology/approach: Accessing the Cost Assessment Data Enterprise (CADE) database, 451 contracts consisting of 863 contract line item numbers (CLINs) were initially retrieved and analyzed in three stages. The first replicated the work conducted in 1990s. The second stage entailed calculating 95 per cent confidence intervals and hypothesis tests regarding percentage accuracy of EACs for a contract's final CAC. Lastly, regression analysis was conducted to characterize major, moderate and minor influencers on EAC reliability. Findings: For modern contracts, EACCR aligns more with EACCPI and no longer demonstrates early accuracy of a contract's final CAC. Contract percentage completion strongly reduced the per cent error of estimating CAC, while cost-plus-fixed-fee contracts and those with no work breakdown structure greater than Level 2 negatively affected accuracy. Social implications: To militate against optimism of early assessment of a contract's true cost. Originality/value: This paper provides empirical evidence that EACCR behaves more like EACCPI with respect to modern contracts, suggesting that today's contracts have relatively high SPI. Therefore, caution is warranted for program managers when estimating the CAC from contract initiation up to and slightly beyond the mid-point of completion. … (more)
- Is Part Of:
- Journal of public procurement. Volume 19:Issue 3(2019)
- Journal:
- Journal of public procurement
- Issue:
- Volume 19:Issue 3(2019)
- Issue Display:
- Volume 19, Issue 3 (2019)
- Year:
- 2019
- Volume:
- 19
- Issue:
- 3
- Issue Sort Value:
- 2019-0019-0003-0000
- Page Start:
- 186
- Page End:
- 200
- Publication Date:
- 2019-09-02
- Subjects:
- Earned value management -- Estimate at completion (EAC) -- Per cent complete -- EAC stability
Government purchasing -- Periodicals
Government purchasing
Periodicals
352.53 - Journal URLs:
- http://firstsearch.oclc.org/fsip?dbname=ABI_INFORM&done=referer ↗
https://www.emeraldinsight.com/loi/jopp ↗
http://www.emeraldinsight.com/ ↗
http://www.pracademics.com/toc-jopp.html ↗ - DOI:
- 10.1108/JOPP-02-2018-0006 ↗
- Languages:
- English
- ISSNs:
- 1535-0118
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 11375.xml