A general risk‐based adaptive management scheme incorporating the Bayesian Network Relative Risk Model with the South River, Virginia, as case study. (18th July 2016)
- Record Type:
- Journal Article
- Title:
- A general risk‐based adaptive management scheme incorporating the Bayesian Network Relative Risk Model with the South River, Virginia, as case study. (18th July 2016)
- Main Title:
- A general risk‐based adaptive management scheme incorporating the Bayesian Network Relative Risk Model with the South River, Virginia, as case study
- Authors:
- Landis, Wayne G
Markiewicz, April J
Ayre, Kim K
Johns, Annie F
Harris, Meagan J
Stinson, Jonah M
Summers, Heather M - Abstract:
- ABSTRACT: Adaptive management has been presented as a method for the remediation, restoration, and protection of ecological systems. Recent reviews have found that the implementation of adaptive management has been unsuccessful in many instances. We present a modification of the model first formulated by Wyant and colleagues that puts ecological risk assessment into a central role in the adaptive management process. This construction has 3 overarching segments. Public engagement and governance determine the goals of society by identifying endpoints and specifying constraints such as costs. The research, engineering, risk assessment, and management section contains the decision loop estimating risk, evaluating options, specifying the monitoring program, and incorporating the data to re‐evaluate risk. The 3rd component is the recognition that risk and public engagement can be altered by various externalities such as climate change, economics, technological developments, and population growth. We use the South River, Virginia, USA, study area and our previous research to illustrate each of these components. In our example, we use the Bayesian Network Relative Risk Model to estimate risks, evaluate remediation options, and provide lists of monitoring priorities. The research, engineering, risk assessment, and management loop also provides a structure in which data and the records of what worked and what did not, the learning process, can be stored. The learning process is aABSTRACT: Adaptive management has been presented as a method for the remediation, restoration, and protection of ecological systems. Recent reviews have found that the implementation of adaptive management has been unsuccessful in many instances. We present a modification of the model first formulated by Wyant and colleagues that puts ecological risk assessment into a central role in the adaptive management process. This construction has 3 overarching segments. Public engagement and governance determine the goals of society by identifying endpoints and specifying constraints such as costs. The research, engineering, risk assessment, and management section contains the decision loop estimating risk, evaluating options, specifying the monitoring program, and incorporating the data to re‐evaluate risk. The 3rd component is the recognition that risk and public engagement can be altered by various externalities such as climate change, economics, technological developments, and population growth. We use the South River, Virginia, USA, study area and our previous research to illustrate each of these components. In our example, we use the Bayesian Network Relative Risk Model to estimate risks, evaluate remediation options, and provide lists of monitoring priorities. The research, engineering, risk assessment, and management loop also provides a structure in which data and the records of what worked and what did not, the learning process, can be stored. The learning process is a central part of adaptive management. We conclude that risk assessment can and should become an integral part of the adaptive management process. Integr Environ Assess Manag 2017;13:115–126. © 2016 SETAC. Key Points: Ecological risk assessment will enhance the adaptive management process and provide a structure for learning and communication. We have proposed an adaptive management structure that incorporates risk assessment, the inclusion of governance and public engagement, and recognizes that externalities will change the parameters and decisions to be made. The South River is a case study that incorporates each of the components of the adaptive management process and explicitly uses risk assessment as a critical part of the remediation plan. … (more)
- Is Part Of:
- Integrated environmental assessment and management. Volume 13:Number 1(2017:Jan.)
- Journal:
- Integrated environmental assessment and management
- Issue:
- Volume 13:Number 1(2017:Jan.)
- Issue Display:
- Volume 13, Issue 1 (2017)
- Year:
- 2017
- Volume:
- 13
- Issue:
- 1
- Issue Sort Value:
- 2017-0013-0001-0000
- Page Start:
- 115
- Page End:
- 126
- Publication Date:
- 2016-07-18
- Subjects:
- Adaptive management -- Ecological risk assessment -- Bayesian Network Relative Risk Model -- South River, VA
Environmental management -- Periodicals
Pollution -- Periodicals
Environmental toxicology -- Periodicals
Environmental risk assessment -- Periodicals
Environmental impact analysis -- Periodicals
628 - Journal URLs:
- http://www.bioone.org/loi/ieam ↗
http://firstsearch.oclc.org ↗
http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)1551-3793 ↗
http://www.bioone.org/bioone/?request=get-archive&issn=1551-3777 ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/ieam.1800 ↗
- Languages:
- English
- ISSNs:
- 1551-3777
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4531.815100
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 11189.xml