Quantification of economic uncertainty for synthetic natural gas production in a H2O permeable membrane reactor as simultaneous power-to-gas and CO2 utilization technologies. (1st September 2019)
- Record Type:
- Journal Article
- Title:
- Quantification of economic uncertainty for synthetic natural gas production in a H2O permeable membrane reactor as simultaneous power-to-gas and CO2 utilization technologies. (1st September 2019)
- Main Title:
- Quantification of economic uncertainty for synthetic natural gas production in a H2O permeable membrane reactor as simultaneous power-to-gas and CO2 utilization technologies
- Authors:
- Lee, Boreum
Lee, Hyunjun
Kim, Sehwa
Cho, Hyun-Seok
Cho, Won-Chul
Jeon, Byong-Hun
Kim, Chang-Hee
Lim, Hankwon - Abstract:
- Abstract: Economic uncertainty analysis of employing a membrane reactor (MR) equipped with H2 O separation membranes for a synthetic natural gas (SNG) production as simultaneous power-to-gas and CO2 utilization technologies was carried out. Based on previously reported reaction kinetics, process simulation models were created for a conventional packed-bed reactor (PBR) and an MR. Deterministic economic analysis showed the unit SNG production cost of 1.67 $ kgSNG −1 in an MR compared to 1.82 $ kgSNG −1 in a PBR for a SNG production capacity of 1000 kg d −1, showing about 8% cost reductions in the MR. From sensitivity analysis, raw material and labor were identified as the key economic factors to affect a unit SNG production cost for all cases studied. Stochastic economic analysis using a Monte-Carlo simulation method provided better insights for economic-uncertainty associated with premature technology like a SNG production in an MR using H2 O separation membranes by presenting a wide range of SNG production costs and their probability. Highlights: A H2 O permeable membrane reactor (MR) was proposed to improve SNG yield. Deterministic and stochastic economic analysis for SNG production were performed. For industrial-scale plant, the MR showed about 8% cost saving of a unit SNG cost. Uncertainty analysis presented a wide range of a unit cost from 1.01 to 2.28 $ kg −1 .
- Is Part Of:
- Energy. Volume 182(2019)
- Journal:
- Energy
- Issue:
- Volume 182(2019)
- Issue Display:
- Volume 182, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 182
- Issue:
- 2019
- Issue Sort Value:
- 2019-0182-2019-0000
- Page Start:
- 1058
- Page End:
- 1068
- Publication Date:
- 2019-09-01
- Subjects:
- Economic analysis -- Power-to-gas -- Synthetic natural gas -- Membrane reactor -- CO2 utilization -- Uncertainty analysis
Power resources -- Periodicals
Power (Mechanics) -- Periodicals
Energy consumption -- Periodicals
333.7905 - Journal URLs:
- http://www.elsevier.com/journals ↗
- DOI:
- 10.1016/j.energy.2019.06.073 ↗
- Languages:
- English
- ISSNs:
- 0360-5442
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.445000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 11160.xml