X¯ Chart with Estimated Parameters: The Conditional ARL Distribution and New Insights. Issue 6 (14th February 2019)
- Record Type:
- Journal Article
- Title:
- X¯ Chart with Estimated Parameters: The Conditional ARL Distribution and New Insights. Issue 6 (14th February 2019)
- Main Title:
- X¯ Chart with Estimated Parameters: The Conditional ARL Distribution and New Insights
- Authors:
- Jardim, Felipe S.
Chakraborti, Subhabrata
Epprecht, Eugenio K. - Abstract:
- Abstract : Performance measures of control charts with estimated parameters are random variables and vary significantly across reference samples. In this context, a recent idea has been to study the distribution of the realized (or conditional) in‐control average run length ( CARL 0 ) [or, equivalently, the conditional false‐alarm rate ( CFAR )] for a set of estimates from a given reference sample and apply the exceedance probability criterion ( EPC ) to design control charts that ensure a desirable in‐control performance. Under the EPC, the probability that the CARL 0 (or the CFAR ) is at least (or at most) equal to a specified value is guaranteed with a high probability, which helps prevent low in‐control ARL's (or high false‐alarm rates) from occurring. In order to apply the EPC, the c.d.f. of the CARL 0 (or the CFAR ) is necessary. For the two‐sided Shewhart Xbar control chart, under normality, we derive the exact c.d.f. of the CARL 0 and the CFAR, currently not available in the literature. Using these key results, we calculate the minimum number of Phase I samples required to guarantee a desired in‐control performance in terms of the EPC . Since the required amount of data can be prohibitively large, we also provide exact formulas for adjustments to the control limits for a given amount of Phase I data; some tables are provided. Our adjustment formulas give more accurate results compared to some available methods. The impact of these adjustments on the out‐of‐controlAbstract : Performance measures of control charts with estimated parameters are random variables and vary significantly across reference samples. In this context, a recent idea has been to study the distribution of the realized (or conditional) in‐control average run length ( CARL 0 ) [or, equivalently, the conditional false‐alarm rate ( CFAR )] for a set of estimates from a given reference sample and apply the exceedance probability criterion ( EPC ) to design control charts that ensure a desirable in‐control performance. Under the EPC, the probability that the CARL 0 (or the CFAR ) is at least (or at most) equal to a specified value is guaranteed with a high probability, which helps prevent low in‐control ARL's (or high false‐alarm rates) from occurring. In order to apply the EPC, the c.d.f. of the CARL 0 (or the CFAR ) is necessary. For the two‐sided Shewhart Xbar control chart, under normality, we derive the exact c.d.f. of the CARL 0 and the CFAR, currently not available in the literature. Using these key results, we calculate the minimum number of Phase I samples required to guarantee a desired in‐control performance in terms of the EPC . Since the required amount of data can be prohibitively large, we also provide exact formulas for adjustments to the control limits for a given amount of Phase I data; some tables are provided. Our adjustment formulas give more accurate results compared to some available methods. The impact of these adjustments on the out‐of‐control performance of the chart is examined in detail. A summary and some recommendations are provided. … (more)
- Is Part Of:
- Production and operations management. Volume 28:Issue 6(2019)
- Journal:
- Production and operations management
- Issue:
- Volume 28:Issue 6(2019)
- Issue Display:
- Volume 28, Issue 6 (2019)
- Year:
- 2019
- Volume:
- 28
- Issue:
- 6
- Issue Sort Value:
- 2019-0028-0006-0000
- Page Start:
- 1545
- Page End:
- 1557
- Publication Date:
- 2019-02-14
- Subjects:
- average run length -- false alarm rate -- conditional run length distribution -- exceedance probability criterion -- guaranteed in‐control performance -- out‐of‐control performance -- Phase I and Phase II
Production management -- Periodicals
658.505 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1111/(ISSN)1937-5956 ↗
http://www.poms.org/journal ↗
http://www3.interscience.wiley.com/journal/121568272/home ↗
http://onlinelibrary.wiley.com/ ↗
http://www.umi.com/pqdauto/ ↗ - DOI:
- 10.1111/poms.12985 ↗
- Languages:
- English
- ISSNs:
- 1059-1478
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 6853.076600
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 10855.xml