Cite
HARVARD Citation
Liang, P. et al. (2015). An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness. Mathematical problems in engineering. p. . [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Liang, P. et al. (2015). An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness. Mathematical problems in engineering. p. . [Online].