Cite

HARVARD Citation

    Błażewicz, J. et al. (2019). Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work. Engineering optimization. 51 (7), pp. 1279-1280. [Online]. 
  
Back to record