Cite

HARVARD Citation

    Li, H. et al. (2019). A novel minimum-time feedrate schedule method for five-axis sculpture surface machining with kinematic and geometric constraints. Proceedings of the Institution of Mechanical Engineers. pp. 1483-1499. [Online]. 
  
Back to record