Re-assessment of station blackout accident in VVER-1000 NPP with additional measures following Fukushima accident using Relap/Mod3.2. (July 2019)
- Record Type:
- Journal Article
- Title:
- Re-assessment of station blackout accident in VVER-1000 NPP with additional measures following Fukushima accident using Relap/Mod3.2. (July 2019)
- Main Title:
- Re-assessment of station blackout accident in VVER-1000 NPP with additional measures following Fukushima accident using Relap/Mod3.2
- Authors:
- Jabbari, M.
Hadad, K.
Pirouzmand, A. - Abstract:
- Highlights: SBO accident scenarios with and without considering operator actions are simulated. Two scenarios were proposed to prevent the severe core damage during the SBO accident. Additional measures, to manage the accident consequences are determined. Suggested scenarios are re-assessed for fuel rod damage core cooling. The SBO accident management guidelines are extended for VVER-1000 NPP. Abstract: The Fukushima accident indicated that the safety systems of nuclear power plants should be re-assessed against site-specific extreme natural hazards using additional BDBA management equipment and organizational measures. The occurrence of loss of power supply (SBO) accident in VVER-1000 NPP, which is the most contributor to the total core damage frequency, is the focus of this study. The SBO accident analysis of the reference plant with and without operator actions are investigated by Relap5 code to identify the characteristics of additional measures, available times for operator actions (critical time points) as well as scenarios to manage the accident consequences. The additional BDBA management equipment includes robust and reliable portable additional electrical power backup sources and water supplies into the primary and secondary cooling system to remove the residual heat of the core. The main purpose of this study is an evaluation of efficiency and sufficiency of additional equipment and organizational measures at NPP site based on deterministic safety analysis duringHighlights: SBO accident scenarios with and without considering operator actions are simulated. Two scenarios were proposed to prevent the severe core damage during the SBO accident. Additional measures, to manage the accident consequences are determined. Suggested scenarios are re-assessed for fuel rod damage core cooling. The SBO accident management guidelines are extended for VVER-1000 NPP. Abstract: The Fukushima accident indicated that the safety systems of nuclear power plants should be re-assessed against site-specific extreme natural hazards using additional BDBA management equipment and organizational measures. The occurrence of loss of power supply (SBO) accident in VVER-1000 NPP, which is the most contributor to the total core damage frequency, is the focus of this study. The SBO accident analysis of the reference plant with and without operator actions are investigated by Relap5 code to identify the characteristics of additional measures, available times for operator actions (critical time points) as well as scenarios to manage the accident consequences. The additional BDBA management equipment includes robust and reliable portable additional electrical power backup sources and water supplies into the primary and secondary cooling system to remove the residual heat of the core. The main purpose of this study is an evaluation of efficiency and sufficiency of additional equipment and organizational measures at NPP site based on deterministic safety analysis during SBO accident. This analysis is also expected to prepare a useful guideline for the SBO management in VVER-1000/V-446 NPP. A validated Relap5 model of VVER-1000 is employed to implement the proposed SBO accident scenarios consisting of residual heat removal through primary and secondary cooling systems as well as additional measures to mitigate this accident. The main thermal-hydraulic parameters of NPP in response to SBO accident are compared with specified acceptance criteria. The deterministic safety analysis demonstrates the provided accident scenarios with specified additional BDBA management equipment ensures the long-term reliable cooling of the reactor core under loss of power supply condition. The result also illustrates that a high degree of confidence in the robustness of the VVER-1000 NPP could be achieved against SBO accident with the inclusion of additional measures. … (more)
- Is Part Of:
- Annals of nuclear energy. Volume 129(2019)
- Journal:
- Annals of nuclear energy
- Issue:
- Volume 129(2019)
- Issue Display:
- Volume 129, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 129
- Issue:
- 2019
- Issue Sort Value:
- 2019-0129-2019-0000
- Page Start:
- 316
- Page End:
- 330
- Publication Date:
- 2019-07
- Subjects:
- Fukushima accident -- SBO -- Additional measures -- DSA -- Relap5/Mod3.2
Nuclear energy -- Periodicals
Nuclear engineering -- Periodicals
621.4805 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03064549 ↗
http://catalog.hathitrust.org/api/volumes/oclc/2243298.html ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.anucene.2019.02.006 ↗
- Languages:
- English
- ISSNs:
- 0306-4549
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1043.150000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 9827.xml