Parallel machine replacement under horizon uncertainty. Issue 1 (2nd January 2019)
- Record Type:
- Journal Article
- Title:
- Parallel machine replacement under horizon uncertainty. Issue 1 (2nd January 2019)
- Main Title:
- Parallel machine replacement under horizon uncertainty
- Authors:
- Seif, Javad
Shields, Brett A.
Yu, Andrew Junfang - Abstract:
- Abstract: Construction projects usually get delayed for several time periods. When the planning horizon of a project is extended, projections for purchase and salvage of machinery within the planning horizon become inaccurate and less beneficial and often lead to unexpected costs. In this article, we formulate a parallel machine replacement (PMR) problem as a two-stage stochastic program with an uncertain planning horizon. We consider renting as an alternative to purchasing and maintaining the machinery. We show the application of the model through a case study in construction projects. Through numerical analysis, we derive managerial implications and show the value of the stochastic model.
- Is Part Of:
- Engineering economist. Volume 64:Issue 1(2019)
- Journal:
- Engineering economist
- Issue:
- Volume 64:Issue 1(2019)
- Issue Display:
- Volume 64, Issue 1 (2019)
- Year:
- 2019
- Volume:
- 64
- Issue:
- 1
- Issue Sort Value:
- 2019-0064-0001-0000
- Page Start:
- 1
- Page End:
- 23
- Publication Date:
- 2019-01-02
- Subjects:
- Engineering -- Estimates -- Periodicals
Industrial management -- Periodicals
338.4762005 - Journal URLs:
- http://www.tandfonline.com/toc/utee20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/0013791X.2018.1535012 ↗
- Languages:
- English
- ISSNs:
- 0013-791X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3759.550000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 9786.xml