Cite

HARVARD Citation

    Miyata, H. et al. (2019). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering optimization. 51 (4), pp. 680-698. [Online]. 
  
Back to record