Excess Revenue Allocation for Build-Operate-Transfer Highway Projects. (1st July 2016)
- Record Type:
- Journal Article
- Title:
- Excess Revenue Allocation for Build-Operate-Transfer Highway Projects. (1st July 2016)
- Main Title:
- Excess Revenue Allocation for Build-Operate-Transfer Highway Projects
- Authors:
- Song, Jinbo
Jin, Lulu
Dong, Wanli - Abstract:
- Revenue uncertainty and volatility are problems in BOT highway projects because it is difficult to predict accurately future traffic volume. In high traffic demands, the absence of an excess revenue allocation mechanism leads to the private sector obtaining huge profits, and a high revenue risk to the government and the public. To solve this problem, the Black–Scholes (B–S) pricing method is used to determine the revenue cap, and a dynamic model is proposed to determine the excess revenue allocation proportion considering the consumer surplus rate and the revenue cap. Finally, the proposed model is illustrated by a numerical example.
- Is Part Of:
- Journal of transport economics and policy. Volume 50:Number 3(2016:Jul.)
- Journal:
- Journal of transport economics and policy
- Issue:
- Volume 50:Number 3(2016:Jul.)
- Issue Display:
- Volume 50, Issue 3 (2016)
- Year:
- 2016
- Volume:
- 50
- Issue:
- 3
- Issue Sort Value:
- 2016-0050-0003-0000
- Page Start:
- 304
- Page End:
- 324
- Publication Date:
- 2016-07-01
- Subjects:
- Transportation -- Periodicals
388.05 - Journal URLs:
- http://www.ingentaconnect.com/content/lse/jtep ↗
http://www.bath.ac.uk/e-journals/jtep/ ↗ - DOI:
- ↗
- Languages:
- English
- ISSNs:
- 1754-5951
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 9507.xml