Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products. Issue 2 (17th January 2019)
- Record Type:
- Journal Article
- Title:
- Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products. Issue 2 (17th January 2019)
- Main Title:
- Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products
- Authors:
- Marconi, Marco
Germani, Michele
Mandolini, Marco
Favi, Claudio - Abstract:
- Abstract : Design for end-of-life and design for disassembly are enabling design strategies for the implementation of business models based on the circular economy paradigm. The paper presents a method for calculating the effective disassembly sequence and time for industrial products. Five steps support designers in defining liaisons and related properties and precedence among components with the aim to calculate the best disassembly sequence and time. The effective disassembly time is computed considering the actual conditions of a product and its components (e.g. deformation, rust and wear) using corrective factors. This aspect represents the main contribution to the state of the art in the field of design for disassembly. The corrective factors are derived from a specific data mining process, based on the observation of real de-manufacturing activities. The proposed approach has been used for calculating the disassembly times of target components in a washing machine and in a coffee machine. The case studies highlight the method reliability of both: definition of time-effective disassembly sequences and assessment of effective disassembly times. In particular, a comparison of experimental tests shows a maximum deviation of −6% for the electric motor of the washing machine and −3% for the water pump of the coffee machine.
- Is Part Of:
- International journal of production research. Volume 57:Issue 2(2019)
- Journal:
- International journal of production research
- Issue:
- Volume 57:Issue 2(2019)
- Issue Display:
- Volume 57, Issue 2 (2019)
- Year:
- 2019
- Volume:
- 57
- Issue:
- 2
- Issue Sort Value:
- 2019-0057-0002-0000
- Page Start:
- 599
- Page End:
- 623
- Publication Date:
- 2019-01-17
- Subjects:
- design for disassembly -- disassembly planning -- data mining -- estimated disassembly time -- de-manufacturing -- target disassembly
Factory management -- Periodicals
658.57 - Journal URLs:
- http://www.tandfonline.com/toc/tprs20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/00207543.2018.1472404 ↗
- Languages:
- English
- ISSNs:
- 0020-7543
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.486000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 9443.xml