Investigating the causes of delay in grain bin construction projects: the case of China. Issue 1 (2nd January 2019)
- Record Type:
- Journal Article
- Title:
- Investigating the causes of delay in grain bin construction projects: the case of China. Issue 1 (2nd January 2019)
- Main Title:
- Investigating the causes of delay in grain bin construction projects: the case of China
- Authors:
- Chen, Gui-Xiang
Shan, Ming
Chan, Albert P. C.
Liu, Xu
Zhao, Yi-Qing - Abstract:
- ABSTRACT: Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment, ' 'poor communication among contracting parties, ' 'problems with subcontractors, ' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.
- Is Part Of:
- International journal of construction management. Volume 19:Issue 1(2019)
- Journal:
- International journal of construction management
- Issue:
- Volume 19:Issue 1(2019)
- Issue Display:
- Volume 19, Issue 1 (2019)
- Year:
- 2019
- Volume:
- 19
- Issue:
- 1
- Issue Sort Value:
- 2019-0019-0001-0000
- Page Start:
- 1
- Page End:
- 14
- Publication Date:
- 2019-01-02
- Subjects:
- Cause of delay -- grain bin projects -- factor analysis -- structural equation modelling
Building -- Periodicals
Construction industry -- Periodicals
690 - Journal URLs:
- http://www.tandfonline.com/toc/tjcm20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/15623599.2017.1354514 ↗
- Languages:
- English
- ISSNs:
- 1562-3599
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 9141.xml