Experimental study of rigid connection of drilled beam to CFT column with external stiffeners. (February 2019)
- Record Type:
- Journal Article
- Title:
- Experimental study of rigid connection of drilled beam to CFT column with external stiffeners. (February 2019)
- Main Title:
- Experimental study of rigid connection of drilled beam to CFT column with external stiffeners
- Authors:
- Fanaie, Nader
Moghadam, Hossein Sadeghi - Abstract:
- Abstract: This research is intended to investigate the behaviour of rigid connection of steel beam to CFT column with external T stiffeners. However, the investigations have shown that the stress concentration in the location of stiffener groove welds to the beam flange and column web causes abrupt fragile failure leading to ductility reduction of the connection. In the current study, beam section is reduced using the method of drilling beam flange so as to diminish the stress concentration and increase the ductility. This method is much easier to fabricate compared to RBS (cutting with CNC machine) and more applicable for existing buildings as well. In this research project two series of analytical models with constant and variable holes are investigated to evaluate the effects of different parameters of drilling on the local behavior of connections. Finite element method using ABAQUS software has been employed for analyses. In another part of this survey, two full scale samples are selected out of the analytical models, and experimentally investigated. According to the obtained results, drilling the beam flange results in decrease in stress concentration in the connection location of stiffener to the beam and column. In addition, it decreases the probability of failure in the expected modes 1 (shear failure of T-shaped horizontal stiffener) and 2 (tension failure of T-shaped vertical stiffener in connection to the column web) and increase the ductility of connection.Abstract: This research is intended to investigate the behaviour of rigid connection of steel beam to CFT column with external T stiffeners. However, the investigations have shown that the stress concentration in the location of stiffener groove welds to the beam flange and column web causes abrupt fragile failure leading to ductility reduction of the connection. In the current study, beam section is reduced using the method of drilling beam flange so as to diminish the stress concentration and increase the ductility. This method is much easier to fabricate compared to RBS (cutting with CNC machine) and more applicable for existing buildings as well. In this research project two series of analytical models with constant and variable holes are investigated to evaluate the effects of different parameters of drilling on the local behavior of connections. Finite element method using ABAQUS software has been employed for analyses. In another part of this survey, two full scale samples are selected out of the analytical models, and experimentally investigated. According to the obtained results, drilling the beam flange results in decrease in stress concentration in the connection location of stiffener to the beam and column. In addition, it decreases the probability of failure in the expected modes 1 (shear failure of T-shaped horizontal stiffener) and 2 (tension failure of T-shaped vertical stiffener in connection to the column web) and increase the ductility of connection. Moreover, such connections can be used in the intermediate as well as special moment resisting frames. Highlights: Reducing beam section using the method of drilling beam flange to diminish the stress concentration. Using an easier and more applicable method for existing buildings (Drilling compared to cutting with CNC machine in ordinary RBS). Evaluation the effects of different parameters of drilling on the local behavior of connections Experimental investigation on two full scale specimens. … (more)
- Is Part Of:
- Journal of constructional steel research. Volume 153(2019)
- Journal:
- Journal of constructional steel research
- Issue:
- Volume 153(2019)
- Issue Display:
- Volume 153, Issue 2019 (2019)
- Year:
- 2019
- Volume:
- 153
- Issue:
- 2019
- Issue Sort Value:
- 2019-0153-2019-0000
- Page Start:
- 209
- Page End:
- 221
- Publication Date:
- 2019-02
- Subjects:
- Rigid beam to column connection -- Concrete Filled Tube (CFT) column -- T-shaped stiffener -- Beam drilling -- Reduced Beam Section (RBS)
Steel, Structural -- Periodicals
Building, Iron and steel -- Periodicals
Acier de construction -- Périodiques
Construction métallique -- Périodiques
624.1821 - Journal URLs:
- http://www.sciencedirect.com/science/journal/0143974X ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.jcsr.2018.10.016 ↗
- Languages:
- English
- ISSNs:
- 0143-974X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4965.193000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 9063.xml