Cite

HARVARD Citation

    Chen, R. et al. (2019). Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs. Engineering optimization. 51 (2), pp. 217-230. [Online]. 
  
Back to record