A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times. (July 2015)
- Record Type:
- Journal Article
- Title:
- A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times. (July 2015)
- Main Title:
- A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
- Authors:
- Nagano, Marcelo Seido
Miyata, Hugo Hissashi
Araújo, Daniella Castro - Abstract:
- Highlights: The problem of scheduling jobs in a no-wait flow shop with sequence-dependent setup times with the objective of minimizing the total flow time. A new constructive heuristic, named QUARTS, in order to obtain good approximate solutions in a short CPU time. The computational results showed that IGLS obtained the best results and QUARTS presented the best performance regarding other constructive heuristics. Abstract: In this paper, we addressed the problem of scheduling jobs in a no-wait flow shop with sequence-dependent setup times with the objective of minimizing the total flow time. As this problem is well-known for being NP-hard, we present a new constructive heuristic, named QUARTS, in order to obtain good approximate solutions in a short CPU time. QUARTS breaks the problem in quartets in order to minimize the total flow time. The method was tested with other literature methods: BAH and BIH by Bianco et al. (1999)[6], TRIPS, by Brown et al. (2004)[7] and the metaheuristic Iterated Greedy with Local Search proposed by Ruiz and Stützle (2007)[25] . The computational results showed that IGLS obtained the best results and QUARTS presented the best performance regarding other constructive heuristics.
- Is Part Of:
- Journal of manufacturing systems. Volume 36(2015)
- Journal:
- Journal of manufacturing systems
- Issue:
- Volume 36(2015)
- Issue Display:
- Volume 36, Issue 2015 (2015)
- Year:
- 2015
- Volume:
- 36
- Issue:
- 2015
- Issue Sort Value:
- 2015-0036-2015-0000
- Page Start:
- 224
- Page End:
- 230
- Publication Date:
- 2015-07
- Subjects:
- Scheduling -- Heuristic -- No-wait flowshop -- Sequence-dependent setup -- Flowtime
Manufacturing processes -- Periodicals
Production engineering -- Data processing -- Periodicals
Robots, Industrial -- Periodicals
Production, Technique de la -- Informatique -- Périodiques
Robots industriels -- Périodiques
Electronic journals
670.42 - Journal URLs:
- http://www.sciencedirect.com/science/journal/02786125 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.jmsy.2014.06.007 ↗
- Languages:
- English
- ISSNs:
- 0278-6125
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 5011.650000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 8966.xml