A multi–step approach to long–term open–pit production planning. (29th December 2014)
- Record Type:
- Journal Article
- Title:
- A multi–step approach to long–term open–pit production planning. (29th December 2014)
- Main Title:
- A multi–step approach to long–term open–pit production planning
- Authors:
- Tabesh, Mohammad
Mieth, Clemens
Askari–Nasab, Hooman - Abstract:
- The objective of this paper is to develop, verify, and present a multi–step methodology for three interrelated key components of open–pit mine planning: controlled optimal phase–design, characterisation of selective mining–units, and long–term production scheduling optimisation. A hybrid solution methodology for open–pit phase–design using integer programming and a local search heuristic is presented. Next, a hierarchical clustering approach with size and shape control, which aggregates blocks into minable polygons constrained within the pushback boundaries, is presented; and finally, a mixed integer linear programming mathematical model, which uses the generated pushbacks and aggregates as the planning units to provide near–optimal practical life–of–mine schedules, is introduced. In addition, the model inherently solves the cut–off grade optimisation problem. Two case–studies of real–size deposits are presented to illustrate practicality of the developed methodologies, and also to compare the results against industrial conventional practices to assess validity, performance, strengths, and limitations of the developed methodologies.
- Is Part Of:
- International journal of mining and mineral engineering. Volume 5:Number 4(2014)
- Journal:
- International journal of mining and mineral engineering
- Issue:
- Volume 5:Number 4(2014)
- Issue Display:
- Volume 5, Issue 4 (2014)
- Year:
- 2014
- Volume:
- 5
- Issue:
- 4
- Issue Sort Value:
- 2014-0005-0004-0000
- Page Start:
- 273
- Page End:
- 298
- Publication Date:
- 2014-12-29
- Subjects:
- aggregation -- hierarchical clustering -- mine production scheduling -- mixed integer linear programming -- MILP -- pushback design -- open pit production planning -- long–term planning -- optimal phase design -- mathematical modelling -- mining industry
Mining engineering -- Periodicals
Mines and mineral resources -- Periodicals
622.05 - Journal URLs:
- http://www.inderscience.com/browse/index.php?action=articles&journalID=265 ↗
http://www.inderscience.com/ ↗ - Languages:
- English
- ISSNs:
- 1754-890X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 8822.xml