Cite
HARVARD Citation
Zhang, H. et al. (2018). Investigation and Analysis on the Setting of Cross Passage and Auxiliary Passage in Extra-Long Highway Tunnel. Procedia engineering. pp. 659-667. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Zhang, H. et al. (2018). Investigation and Analysis on the Setting of Cross Passage and Auxiliary Passage in Extra-Long Highway Tunnel. Procedia engineering. pp. 659-667. [Online].