A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry. (September 2015)
- Record Type:
- Journal Article
- Title:
- A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry. (September 2015)
- Main Title:
- A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry
- Authors:
- Jiang, Shenglong
Liu, Min
Hao, Jinghua
Qian, Wangping - Abstract:
- Highlights: A SCC scheduling problem with controllable processing times is formulated. A SCC scheduling problem is decomposed into two tractable subproblems. A HDE algorithm is proposed for the parallel machine scheduling subproblem. An IBLS heuristic method is proposed to solve the HFS scheduling subproblem. Abstract: A steelmaking-continuous casting (SCC) scheduling problem is an example of complex hybrid flow shop scheduling problem (HFSSP) with a strong industrial background. This paper investigates the SCC scheduling problem that involves controllable processing times (CPT) with multiple objectives concerning the total waiting time, earliness/tardiness and adjusting cost. The SCC scheduling problem with CPT is seldom discussed in the existing literature. This study is motivated by the practical situation of a large integrated steel company in which the just-in-time (JIT) and cost-cutting production strategy have become a significant concern. To address this complex HFSSP, the scheduling problem is decomposed into two subproblems: a parallel machine scheduling problem (PMSP) in the last stage and an HFSSP in the upstream stages. First, a hybrid differential evolution (HDE) algorithm combined with a variable neighborhood decomposition search (VNDS) is proposed for the former subproblem. Second, an iterative backward list scheduling (IBLS) algorithm is presented to solve the latter subproblem. The effectiveness of this bi-layer optimization approach is verified byHighlights: A SCC scheduling problem with controllable processing times is formulated. A SCC scheduling problem is decomposed into two tractable subproblems. A HDE algorithm is proposed for the parallel machine scheduling subproblem. An IBLS heuristic method is proposed to solve the HFS scheduling subproblem. Abstract: A steelmaking-continuous casting (SCC) scheduling problem is an example of complex hybrid flow shop scheduling problem (HFSSP) with a strong industrial background. This paper investigates the SCC scheduling problem that involves controllable processing times (CPT) with multiple objectives concerning the total waiting time, earliness/tardiness and adjusting cost. The SCC scheduling problem with CPT is seldom discussed in the existing literature. This study is motivated by the practical situation of a large integrated steel company in which the just-in-time (JIT) and cost-cutting production strategy have become a significant concern. To address this complex HFSSP, the scheduling problem is decomposed into two subproblems: a parallel machine scheduling problem (PMSP) in the last stage and an HFSSP in the upstream stages. First, a hybrid differential evolution (HDE) algorithm combined with a variable neighborhood decomposition search (VNDS) is proposed for the former subproblem. Second, an iterative backward list scheduling (IBLS) algorithm is presented to solve the latter subproblem. The effectiveness of this bi-layer optimization approach is verified by computational experiments on well-designed and real-world scheduling instances. This study provides a new perspective on modeling and solving practical SCC scheduling problems. … (more)
- Is Part Of:
- Computers & industrial engineering. Volume 87(2015)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 87(2015)
- Issue Display:
- Volume 87, Issue 2015 (2015)
- Year:
- 2015
- Volume:
- 87
- Issue:
- 2015
- Issue Sort Value:
- 2015-0087-2015-0000
- Page Start:
- 518
- Page End:
- 531
- Publication Date:
- 2015-09
- Subjects:
- Steelmaking -- Hybrid flow shop -- Scheduling -- DE -- VNDS
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2015.06.002 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 8705.xml