Steel hybrid onshore wind towers installed with minimal effort: Development of lifting process. Issue 4 (August 2018)
- Record Type:
- Journal Article
- Title:
- Steel hybrid onshore wind towers installed with minimal effort: Development of lifting process. Issue 4 (August 2018)
- Main Title:
- Steel hybrid onshore wind towers installed with minimal effort: Development of lifting process
- Authors:
- Mohammadi, Mohammad Reza Shah
Richter, Carl
Pak, Daniel
Rebelo, Carlos
Feldmann, Markus - Other Names:
- Rebelo Carlos guest-editor.
Correia José guest-editor.
Baniotopoulos Charalampos guest-editor.
De Jesus Abílio guest-editor. - Abstract:
- The total costs per produced kilowatt-hour for wind turbines depend significantly on the investment costs. Thereby, the tower is a relevant cost component, which depends on the chosen supporting structure, the material, and especially on the erection process. Here, an innovative erection process is presented in order to minimize the wind turbine installation, which leads to excluding the extra tall cranes for installing the wind turbines with hub heights over 180 m. In order to propose the innovative erection process, a new hybrid lattice/tubular supporting structure for the onshore wind turbines is designed. The connection component between the tubular part and lattice structure is proposed considering the support functionality for the new erection process. Furthermore, the building steps of the complete erection process are explained. The operational and the lifting loads on wind turbine supporting structure are estimated, and consequently, the erection process stages were analyzed. Finally, the finite element simulation are performed to specify the critical stresses in subcomponents of the supporting structure in each lifting stage and to show the feasibility of the erection process. Moreover, the most critical points and the stages are investigated and stress level in the supporting structure components is computed.
- Is Part Of:
- Wind engineering. Volume 42:Issue 4(2018)
- Journal:
- Wind engineering
- Issue:
- Volume 42:Issue 4(2018)
- Issue Display:
- Volume 42, Issue 4 (2018)
- Year:
- 2018
- Volume:
- 42
- Issue:
- 4
- Issue Sort Value:
- 2018-0042-0004-0000
- Page Start:
- 335
- Page End:
- 352
- Publication Date:
- 2018-08
- Subjects:
- Wind turbine installation -- wind tower self-erection -- erection process
Wind-pressure -- Periodicals
Winds -- Periodicals
Wind power -- Periodicals
Engineering meteorology -- Periodicals
Pression du vent
Vents
Énergie éolienne
Météorologie appliquée
Engineering meteorology
Wind power
Wind-pressure
Winds
Periodicals
621.4505 - Journal URLs:
- http://wie.sagepub.com/ ↗
http://multi-science.metapress.com/content/121513 ↗
http://www.ingentaconnect.com ↗
http://www.multi-science.co.uk/ ↗ - DOI:
- 10.1177/0309524X18777331 ↗
- Languages:
- English
- ISSNs:
- 0309-524X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 8664.xml